IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

36

matching recommendations
Reset
SIC 3089 Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0684 # 11 Y:2003 11 2003 METER WASTE WATER $1,513 $2,000 Not Implemented
UD0684 # 09 Y:2003 09 2003 INSULATE BARE EQUIPMENT $3,252 $8,000 Not Implemented
UD0684 # 10 Y:2003 10 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,396 $613 Not Implemented
UD0684 # 14 Y:2003 14 2003 INSTALL TIMERS AND/OR THERMOSTATS $1,207 $4,000 Not Implemented
UD0684 # 16 Y:2003 16 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $965 $0 Not Implemented
UD0684 # 12 Y:2003 12 2003 REPROCESS SPENT OILS ON SITE FOR RE-USE $3,323 $3,503 Not Implemented
UD0684 # 08 Y:2003 08 2003 INSTALL COMMON HEADER ON COMPRESSORS $3,865 $0 Not Implemented
UD0684 # 01 Y:2003 01 2003 $34,560 $0 Implemented
UD0684 # 02 Y:2003 02 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $23,504 $37,800 Not Implemented
UD0684 # 17 Y:2003 17 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $580 $110 Not Implemented
UD0684 # 03 Y:2003 03 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,995 $29,250 Not Implemented
UD0684 # 13 Y:2003 13 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,290 $660 Not Implemented
UD0684 # 04 Y:2003 04 2003 OPTIMIZE PLANT POWER FACTOR $15,725 $6,450 Not Implemented
UD0684 # 05 Y:2003 05 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $8,700 $770 Not Implemented
UD0684 # 15 Y:2003 15 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,000 $1,400 Not Implemented
UD0684 # 06 Y:2003 06 2003 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $4,792 $100 Not Implemented
UD0684 # 07 Y:2003 07 2003 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $4,780 $0 Not Implemented
BD0245 # 14 Y:2003 14 2003 CONTRACT A WOOD PALLET RECYCLING COMPANY $1,904 $408 Implemented
BD0245 # 13 Y:2003 13 2003 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $15,243 $5,500 Implemented
BD0245 # 12 Y:2003 12 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $204 $9 Not Implemented
BD0245 # 11 Y:2003 11 2003 INSTALL SPECTRAL REFLECTORS / DELAMP $255 $590 Not Implemented
BD0245 # 08 Y:2003 08 2003 USE PHOTOCELL CONTROLS $1,612 $150 Implemented
BD0245 # 06 Y:2003 06 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,682 $0 Implemented
BD0245 # 05 Y:2003 05 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,735 $110 Implemented
BD0245 # 03 Y:2003 03 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,593 $11,310 Implemented