IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

111

matching recommendations
Reset
SIC 32 Stone, Clay, And Glass Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0777 # 06 Y:2008 06 2008 INSTALL DE-AERATOR IN PLACE OF CONDENSATE TANK $35,664 $50,000 Implemented
UD0777 # 05 Y:2008 05 2008 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $45,421 $74,873 Not Implemented
UD0777 # 03 Y:2008 03 2008 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES $86,400 $85,000 Not Implemented
UD0777 # 14 Y:2008 14 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,509 $3,815 Implemented
UD0777 # 11 Y:2008 11 2008 USE MINIMUM STEAM OPERATING PRESSURE $7,900 $0 Not Implemented
UD0777 # 09 Y:2008 09 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $18,821 $1,900 Not Implemented
IC0104 # 07 Y:2005 07 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,510 $0 Implemented
IC0104 # 10 Y:2005 10 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $659 $800 Implemented
IC0104 # 09 Y:2005 09 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,662 $13,166 Implemented
IC0104 # 08 Y:2005 08 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $24,843 $107,641 Implemented
IC0104 # 06 Y:2005 06 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,948 $2,100 Implemented
IC0104 # 05 Y:2005 05 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $2,110 $0 Implemented
IC0104 # 04 Y:2005 04 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $22,421 $119,810 Implemented
IC0104 # 03 Y:2005 03 2005 USE DEMAND CONTROLLER OR LOAD SHEDDER $18,925 $50,000 Not Implemented
IC0104 # 02 Y:2005 02 2005 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,264 $100 Implemented
IC0104 # 01 Y:2005 01 2005 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $25,653 $1,200 Implemented
IC0100 # 04 Y:2005 04 2005 USE PHOTOCELL CONTROLS $3,581 $1,428 Not Implemented
IC0100 # 01 Y:2005 01 2005 RECOVER WASTE HEAT FROM EQUIPMENT $7,879 $7,081 Not Implemented
IC0100 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,298 $1,400 Not Implemented
IC0100 # 03 Y:2005 03 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,359 $0 Not Implemented
IC0100 # 05 Y:2005 05 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,640 $8,722 Not Implemented
IC0100 # 06 Y:2005 06 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $184 $917 Not Implemented
ND0357 # 06 Y:2000 06 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $769 $1,285 Implemented
ND0357 # 05 Y:2000 05 2000 INSTALL OCCUPANCY SENSORS $969 $600 Implemented
ND0357 # 02 Y:2000 02 2000 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $10,318 $250 Implemented