IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

303

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ND0161 # 05 Y:1993 05 1993 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $527 $80 Implemented
ND0153 # 02 Y:1993 02 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,413 $6,235 Implemented
ND0153 # 03 Y:1993 03 1993 USE UTILITY CONTROLLED POWER MANAGEMENT $12,899 $0 Implemented
ND0153 # 05 Y:1993 05 1993 OPTIMIZE PLANT POWER FACTOR $11,871 $16,760 Implemented
ND0153 # 06 Y:1993 06 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,992 $1,262 Implemented
ND0153 # 07 Y:1993 07 1993 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $225 $218 Implemented
ND0026 # 01 Y:1992 01 1992 RECOVER AND REUSE COOLING WATER $24,397 $25,000 Implemented
ND0026 # 02 Y:1992 02 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,600 $16,570 Implemented
ND0026 # 05 Y:1992 05 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,757 $500 Implemented
ND0026 # 06 Y:1992 06 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,338 $5,000 Implemented
ND0026 # 07 Y:1992 07 1992 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,564 $2,000 Implemented
ND0026 # 08 Y:1992 08 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $610 $638 Implemented
ND0004 # 01 Y:1991 01 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $310 $615 Implemented
ND0004 # 02 Y:1991 02 1991 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,370 $160 Implemented
ND0004 # 03 Y:1991 03 1991 DISCONNECT BALLASTS $25 $50 Implemented
ND0004 # 04 Y:1991 04 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,140 $400 Implemented
UD0327 # 01 Y:1990 01 1990 OPTIMIZE PLANT POWER FACTOR $14,606 $12,000 Implemented
UD0327 # 02 Y:1990 02 1990 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $49,772 $3,000 Implemented
UD0327 # 04 Y:1990 04 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $-1,479 $540 Implemented
UD0220 # 01 Y:1987 01 1987 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $7,276 $0 Implemented
UD0220 # 03 Y:1987 03 1987 MINIMIZE WATER USAGE $1,991 $300 Implemented
TS0007 # 03 Y:1984 03 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,860 $0 Implemented
TS0007 # 05 Y:1984 05 1984 INSTALL / REPAIR INSULATION ON STEAM LINES $4,243 $0 Implemented
TS0001 # 01 Y:1984 01 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,951 $16,300 Implemented
TS0001 # 03 Y:1984 03 1984 USE MINIMUM SAFE OVEN VENTILATION $335 $300 Implemented