IAC logo
IAC Assessment: ND0153
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ND0153
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Notre Dame Univ.
Assessment Year 1993
Principal Product Forged Products
NAICS n/a
SIC 3462 - Iron And Steel Forgings
Sales $10,000,000-$50,000,000
# of Employees 345
Plant Area (Sq.Ft.) 215,000
Annual Production 28,856 Pieces
Production Hrs. Annual 5,000
Location (State) IN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $807,605 12,185,229 kWh $0.07
Natural Gas $920,565 356,270 MMBtu $2.58
TOTAL ENERGY COSTS $1,728,170
RECOMMENDED SAVINGS* $95,826 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $34,400
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.3411 REPLACE ELECTRIC MOTORS WITH BACK PRESSURE STEAM TURBINES AND USE EXHAUST STEAM FOR PROCESS HEAT Savings:
$48,899
Cost:
-
$48,899 737,984 - - $48,899
737,984
kWh
-
-
MMBtu
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$6,413
Cost:
$6,235
$6,413 97,011 - - $6,413
97,011
kWh
-
-
MMBtu
03: 2.8122 USE UTILITY CONTROLLED POWER MANAGEMENT Savings:
$12,899
Cost:
-
$12,899 194,607 - - $12,899
194,607
kWh
-
-
MMBtu
04: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$12,527
Cost:
$1,413
$12,527 189,039 - - $12,527
189,039
kWh
-
-
MMBtu
05: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$11,871
Cost:
$16,760
$11,871 - - - $11,871
-
kWh
-
-
MMBtu
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,992
Cost:
$1,262
$2,992 45,135 - - $2,992
45,135
kWh
-
-
MMBtu
07: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES Savings:
$225
Cost:
$218
- - $225 87 -
-
kWh
$225
87
MMBtu
TOTAL RECOMMENDED Savings:
$95,826
Cost:
$25,888
$95,601 1,263,776 $225 87 $95,601
1,263,776
kWh
$225
87
MMBtu
TOTAL IMPLEMENTED Savings:
$34,400
Cost:
$24,475
$34,175 336,753 $225 87 $34,175
336,753
kWh
$225
87
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas