IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

779

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0081 # 08 Y:2017 08 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $832 $1,358 Implemented
IP0081 # 09 Y:2017 09 2017 INSTALL OCCUPANCY SENSORS $201 $409 Implemented
IP0081 # 10 Y:2017 10 2017 REPLACE AIR CURTAIN DOORS WITH SOLID DOORS $1,766 $3,788 Not Implemented
IP0075 # 01 Y:2016 01 2016 INSTALL TIMERS AND/OR THERMOSTATS $2,060 $475 Not Implemented
IP0075 # 02 Y:2016 02 2016 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $49,318 $15,186 Not Implemented
IP0075 # 03 Y:2016 03 2016 OPTIMIZE PLANT POWER FACTOR $144,133 $37,215 Not Implemented
IP0075 # 04 Y:2016 04 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $37,278 $17,193 Implemented
IP0075 # 05 Y:2016 05 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $88,854 $77,418 Implemented
IP0075 # 06 Y:2016 06 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,646 $9,375 Not Implemented
IP0075 # 07 Y:2016 07 2016 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $30,086 $107,214 Not Implemented
IP0068 # 01 Y:2016 01 2016 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $759 $4 Implemented
IP0068 # 02 Y:2016 02 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $688 $5 Implemented
IP0068 # 03 Y:2016 03 2016 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $720 $38 Not Implemented
IP0068 # 04 Y:2016 04 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $491 $159 Implemented
IP0068 # 05 Y:2016 05 2016 INSTALL OCCUPANCY SENSORS $500 $285 Implemented
IP0068 # 06 Y:2016 06 2016 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $136 $82 Not Implemented
IP0068 # 07 Y:2016 07 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,287 $5,648 Implemented
IP0068 # 08 Y:2016 08 2016 OPTIMIZE PLANT POWER FACTOR $3,317 $10,850 Not Implemented
IP0068 # 09 Y:2016 09 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $196 $940 Not Implemented
IP0067 # 01 Y:2016 01 2016 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $996 $0 Implemented
IP0067 # 02 Y:2016 02 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,092 $5 Not Implemented
IP0067 # 03 Y:2016 03 2016 TURN OFF EQUIPMENT WHEN NOT IN USE $9,360 $3 Implemented
IP0067 # 04 Y:2016 04 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,858 $765 Implemented
IP0067 # 05 Y:2016 05 2016 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $35,374 $3,150 Implemented
IP0067 # 06 Y:2016 06 2016 INSTALL OCCUPANCY SENSORS $12,719 $2,549 Not Implemented