Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,316
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0724 # 10 Y:2005 | 10 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,915 | $0 | Not Implemented |
UD0724 # 11 Y:2005 | 11 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $471 | $880 | Implemented |
UD0724 # 05 Y:2005 | 05 | 2005 | SEPARATE CONTROLS OF AIR HANDLERS FROM AC/ HEATING SYSTEMS | $9,550 | $530 | Not Implemented |
UD0724 # 08 Y:2005 | 08 | 2005 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,477 | $0 | Not Implemented |
UD0724 # 04 Y:2005 | 04 | 2005 | INSULATE BARE EQUIPMENT | $13,563 | $6,505 | Implemented |
UD0724 # 07 Y:2005 | 07 | 2005 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,199 | $7,500 | Not Implemented |
UD0724 # 01 Y:2005 | 01 | 2005 | USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS | $59,198 | $30,000 | Not Implemented |
UD0724 # 09 Y:2005 | 09 | 2005 | CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN | $3,364 | $0 | Implemented |
UD0724 # 02 Y:2005 | 02 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $33,240 | $102,000 | Not Implemented |
UD0724 # 03 Y:2005 | 03 | 2005 | USE PHOTOCELL CONTROLS | $16,400 | $0 | Implemented |
UD0724 # 06 Y:2005 | 06 | 2005 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $6,922 | $4,800 | Not Implemented |
UD0723 # 06 Y:2005 | 06 | 2005 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $5,470 | $0 | Not Implemented |
UD0723 # 07 Y:2005 | 07 | 2005 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $4,573 | $0 | Implemented |
UD0723 # 15 Y:2005 | 15 | 2005 | UPGRADE CONTROLS ON COMPRESSORS | $522 | $0 | Implemented |
UD0723 # 08 Y:2005 | 08 | 2005 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,309 | $0 | Implemented |
UD0723 # 12 Y:2005 | 12 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,164 | $0 | Implemented |
UD0723 # 09 Y:2005 | 09 | 2005 | REDUCE WATER USE WITH COUNTER CURRENT RINSING | $3,070 | $2,000 | Not Implemented |
UD0723 # 11 Y:2005 | 11 | 2005 | INSULATE BARE EQUIPMENT | $2,650 | $2,629 | Implemented |
UD0723 # 05 Y:2005 | 05 | 2005 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $6,126 | $7,000 | Implemented |
UD0723 # 02 Y:2005 | 02 | 2005 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $7,430 | $0 | Implemented |
UD0723 # 01 Y:2005 | 01 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $24,840 | $65,105 | Implemented |
UD0723 # 04 Y:2005 | 04 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,315 | $13,340 | Implemented |
UD0723 # 13 Y:2005 | 13 | 2005 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $1,423 | $500 | Not Implemented |
UD0723 # 10 Y:2005 | 10 | 2005 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $2,730 | $0 | Not Implemented |
UD0723 # 03 Y:2005 | 03 | 2005 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $7,394 | $0 | Not Implemented |