Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
88
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0311 # 03 Y:2006 | 03 | 2006 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $12,597 | $7,800 | Not Implemented |
UM0311 # 08 Y:2006 | 08 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,983 | $1,000 | Implemented |
UM0311 # 10 Y:2006 | 10 | 2006 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $1,316 | $370 | Implemented |
UM0311 # 11 Y:2006 | 11 | 2006 | INSULATE BARE EQUIPMENT | $578 | $659 | Implemented |
UM0311 # 05 Y:2006 | 05 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,325 | $450 | Implemented |
UM0311 # 01 Y:2006 | 01 | 2006 | BURN WASTE PAPER FOR HEAT | $109,604 | $27,325 | Not Implemented |
UM0311 # 02 Y:2006 | 02 | 2006 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $13,002 | $6,000 | Not Implemented |
UM0311 # 09 Y:2006 | 09 | 2006 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,525 | $375 | Implemented |
UM0311 # 07 Y:2006 | 07 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,364 | $200 | Not Implemented |
UM0311 # 04 Y:2006 | 04 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $7,001 | $3,000 | Not Implemented |
UM0311 # 06 Y:2006 | 06 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,319 | $6,620 | Implemented |
UM0311 # 12 Y:2006 | 12 | 2006 | INSTALL / REPAIR INSULATION ON STEAM LINES | $101 | $63 | Not Implemented |
UD0751 # 03 Y:2006 | 03 | 2006 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $32,112 | $0 | Not Implemented |
UD0751 # 08 Y:2006 | 08 | 2006 | HEAT TREAT PARTS ONLY TO REQUIRED SPECIFICATIONS OR STANDARDS | $8,395 | $2,000 | Not Implemented |
UD0751 # 10 Y:2006 | 10 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,759 | $5,000 | Implemented |
UD0751 # 09 Y:2006 | 09 | 2006 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $7,062 | $12,000 | Not Implemented |
UD0751 # 01 Y:2006 | 01 | 2006 | REDUCE EXCESS STEAM BLEEDING | $90,000 | $18,000 | Not Implemented |
UD0751 # 07 Y:2006 | 07 | 2006 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $9,000 | $0 | Not Implemented |
UD0751 # 06 Y:2006 | 06 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,066 | $28,800 | Not Implemented |
UD0751 # 05 Y:2006 | 05 | 2006 | ADJUST BURNERS FOR EFFICIENT OPERATION | $13,248 | $10,000 | Not Implemented |
UD0751 # 04 Y:2006 | 04 | 2006 | OPTIMIZE PLANT POWER FACTOR | $21,149 | $61,500 | Not Implemented |
UD0751 # 02 Y:2006 | 02 | 2006 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $63,687 | $0 | Implemented |
UM0309 # 04 Y:2006 | 04 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $11,143 | $13,000 | Not Implemented |
UM0309 # 03 Y:2006 | 03 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,830 | $33,667 | Not Implemented |
UM0309 # 05 Y:2006 | 05 | 2006 | INSULATE BARE EQUIPMENT | $4,362 | $7,550 | Not Implemented |