IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

88

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0311 # 03 Y:2006 03 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $12,597 $7,800 Not Implemented
UM0311 # 08 Y:2006 08 2006 RECOVER WASTE HEAT FROM EQUIPMENT $2,983 $1,000 Implemented
UM0311 # 10 Y:2006 10 2006 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $1,316 $370 Implemented
UM0311 # 11 Y:2006 11 2006 INSULATE BARE EQUIPMENT $578 $659 Implemented
UM0311 # 05 Y:2006 05 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,325 $450 Implemented
UM0311 # 01 Y:2006 01 2006 BURN WASTE PAPER FOR HEAT $109,604 $27,325 Not Implemented
UM0311 # 02 Y:2006 02 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $13,002 $6,000 Not Implemented
UM0311 # 09 Y:2006 09 2006 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,525 $375 Implemented
UM0311 # 07 Y:2006 07 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,364 $200 Not Implemented
UM0311 # 04 Y:2006 04 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $7,001 $3,000 Not Implemented
UM0311 # 06 Y:2006 06 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,319 $6,620 Implemented
UM0311 # 12 Y:2006 12 2006 INSTALL / REPAIR INSULATION ON STEAM LINES $101 $63 Not Implemented
UD0751 # 03 Y:2006 03 2006 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $32,112 $0 Not Implemented
UD0751 # 08 Y:2006 08 2006 HEAT TREAT PARTS ONLY TO REQUIRED SPECIFICATIONS OR STANDARDS $8,395 $2,000 Not Implemented
UD0751 # 10 Y:2006 10 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,759 $5,000 Implemented
UD0751 # 09 Y:2006 09 2006 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $7,062 $12,000 Not Implemented
UD0751 # 01 Y:2006 01 2006 REDUCE EXCESS STEAM BLEEDING $90,000 $18,000 Not Implemented
UD0751 # 07 Y:2006 07 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $9,000 $0 Not Implemented
UD0751 # 06 Y:2006 06 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,066 $28,800 Not Implemented
UD0751 # 05 Y:2006 05 2006 ADJUST BURNERS FOR EFFICIENT OPERATION $13,248 $10,000 Not Implemented
UD0751 # 04 Y:2006 04 2006 OPTIMIZE PLANT POWER FACTOR $21,149 $61,500 Not Implemented
UD0751 # 02 Y:2006 02 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $63,687 $0 Implemented
UM0309 # 04 Y:2006 04 2006 RECOVER WASTE HEAT FROM EQUIPMENT $11,143 $13,000 Not Implemented
UM0309 # 03 Y:2006 03 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,830 $33,667 Not Implemented
UM0309 # 05 Y:2006 05 2006 INSULATE BARE EQUIPMENT $4,362 $7,550 Not Implemented