Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
62
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IP0006 # 06 Y:2012 | 06 | 2012 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $18,261 | $92,692 | Implemented |
IP0006 # 04 Y:2012 | 04 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,847 | $1,416 | Not Implemented |
IP0006 # 02 Y:2012 | 02 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $980 | $0 | Implemented |
IP0006 # 07 Y:2012 | 07 | 2012 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $36,010 | $171,310 | Not Implemented |
IP0006 # 05 Y:2012 | 05 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $490 | $1,156 | Not Implemented |
IP0006 # 01 Y:2012 | 01 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,520 | $0 | Implemented |
IP0006 # 03 Y:2012 | 03 | 2012 | INSTALL OCCUPANCY SENSORS | $1,771 | $730 | Implemented |
IP0005 # 05 Y:2012 | 05 | 2012 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $16,542 | $37,000 | Not Implemented |
IP0005 # 04 Y:2012 | 04 | 2012 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $997 | $1,803 | Not Implemented |
IP0005 # 03 Y:2012 | 03 | 2012 | INSULATE BARE EQUIPMENT | $683 | $0 | Implemented |
IP0005 # 02 Y:2012 | 02 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,540 | $0 | Implemented |
IP0005 # 01 Y:2012 | 01 | 2012 | TURN OFF EQUIPMENT WHEN NOT IN USE | $33,112 | $0 | Not Implemented |
IP0004 # 01 Y:2012 | 01 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,520 | $0 | Implemented |
IP0004 # 02 Y:2012 | 02 | 2012 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $2,343 | $0 | Implemented |
IP0004 # 03 Y:2012 | 03 | 2012 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,110 | $0 | Implemented |
IP0004 # 04 Y:2012 | 04 | 2012 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $21,686 | $18,150 | Implemented |
IP0004 # 05 Y:2012 | 05 | 2012 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $6,462 | $15,867 | Not Implemented |
IP0004 # 06 Y:2012 | 06 | 2012 | REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL | $10,500 | $27,000 | Not Implemented |
IP0002 # 06 Y:2012 | 06 | 2012 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $5,124 | $4,678 | Implemented |
IP0002 # 07 Y:2012 | 07 | 2012 | INSULATE BARE EQUIPMENT | $1,205 | $1,430 | Not Implemented |
IP0002 # 08 Y:2012 | 08 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $760 | $1,216 | Not Implemented |
IP0002 # 05 Y:2012 | 05 | 2012 | INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM | $2,700 | $1,250 | Not Implemented |
IP0002 # 04 Y:2012 | 04 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,900 | $1,320 | Implemented |
IP0002 # 03 Y:2012 | 03 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,515 | $140 | Implemented |
IP0002 # 02 Y:2012 | 02 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,887 | $0 | Not Implemented |