Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
154
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IP0129 # 04 Y:2019 | 04 | 2019 | INSTALL OCCUPANCY SENSORS | $633 | $1,137 | Implemented |
IP0129 # 03 Y:2019 | 03 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $148 | $125 | Implemented |
IP0129 # 02 Y:2019 | 02 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,369 | $210 | Implemented |
IP0129 # 01 Y:2019 | 01 | 2019 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $213 | $5 | Implemented |
IC0228 # 04 Y:2019 | 04 | 2019 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $25,006 | $4,868 | Not Implemented |
IC0228 # 03 Y:2019 | 03 | 2019 | REPAIR OR REPLACE STEAM TRAPS | $9,605 | $2,359 | Implemented |
IC0228 # 01 Y:2019 | 01 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,679 | $14,948 | Implemented |
IC0228 # 02 Y:2019 | 02 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $51,760 | $4,700 | Not Implemented |
IC0228 # 05 Y:2019 | 05 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $759 | $167 | Not Implemented |
IP0128 # 04 Y:2019 | 04 | 2019 | INSTALL OCCUPANCY SENSORS | $2,633 | $1,575 | Implemented |
IP0128 # 03 Y:2019 | 03 | 2019 | DE-ENERGIZE EXCESS TRANSFORMER CAPACITY | $1,067 | $66 | Not Implemented |
IP0128 # 05 Y:2019 | 05 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $25,549 | $36,977 | Implemented |
IP0128 # 01 Y:2019 | 01 | 2019 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $331 | $0 | Implemented |
IP0128 # 02 Y:2019 | 02 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,334 | $76 | Implemented |
IP0127 # 04 Y:2019 | 04 | 2019 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $6,687 | $2,825 | Implemented |
IP0127 # 05 Y:2019 | 05 | 2019 | INSTALL OCCUPANCY SENSORS | $13,877 | $9,532 | Not Implemented |
IP0127 # 03 Y:2019 | 03 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,511 | $70 | Implemented |
IP0127 # 06 Y:2019 | 06 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,631 | $46,979 | Not Implemented |
IP0127 # 01 Y:2019 | 01 | 2019 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $2,178 | $0 | Not Implemented |
IP0127 # 07 Y:2019 | 07 | 2019 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $130,871 | $597,520 | Not Implemented |
IP0127 # 02 Y:2019 | 02 | 2019 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,715 | $30 | Not Implemented |
IP0126 # 03 Y:2019 | 03 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,500 | $125 | Not Implemented |
IP0126 # 08 Y:2019 | 08 | 2019 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,365 | $941 | Not Implemented |
IP0126 # 06 Y:2019 | 06 | 2019 | OPTIMIZE PLANT POWER FACTOR | $73,256 | $43,486 | Not Implemented |
IP0126 # 07 Y:2019 | 07 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,116 | $1,932 | Not Implemented |