IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

232

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0080 # 06 Y:2017 06 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,290 $5,520 Not Implemented
UM0481 # 01 Y:2017 01 2017 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $7,978 $3,000 n/a
UM0481 # 02 Y:2017 02 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,854 $34,336 n/a
UM0481 # 03 Y:2017 03 2017 INSTALL OCCUPANCY SENSORS $18,599 $6,600 n/a
UM0481 # 04 Y:2017 04 2017 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL $50,498 $100,000 n/a
IP0079 # 01 Y:2017 01 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,047 $6 Implemented
IP0079 # 02 Y:2017 02 2017 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $3,466 $0 Not Implemented
IP0079 # 03 Y:2017 03 2017 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $35,073 $678 Not Implemented
IP0079 # 04 Y:2017 04 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,340 $147 Implemented
IP0079 # 05 Y:2017 05 2017 COVER OPEN TANKS $20,504 $766 Implemented
IP0079 # 06 Y:2017 06 2017 INSTALL OCCUPANCY SENSORS $3,135 $302 Not Implemented
IP0079 # 07 Y:2017 07 2017 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $12,652 $1,239 Not Implemented
IP0079 # 08 Y:2017 08 2017 DO NOT USE COMPRESSED AIR FOR PERSONAL COOLING $742 $90 Implemented
IP0079 # 09 Y:2017 09 2017 APPLY FOR INVESTMENT INCENTIVES $38,196 $5,000 Implemented
IP0079 # 10 Y:2017 10 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,415 $9,367 Not Implemented
IP0079 # 11 Y:2017 11 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,761 $2,448 Not Implemented
IP0079 # 12 Y:2017 12 2017 OPTIMIZE PLANT POWER FACTOR $23,934 $35,575 Implemented
IP0079 # 13 Y:2017 13 2017 APPLY FOR INVESTMENT INCENTIVES $2,977 $5,000 Implemented
IP0079 # 14 Y:2017 14 2017 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $10,861 $3,300 Not Implemented
IP0079 # 15 Y:2017 15 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,112 $79,976 Not Implemented
IP0078 # 01 Y:2017 01 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $820 $4 Implemented
IP0078 # 02 Y:2017 02 2017 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,032 $21 Implemented
IP0078 # 03 Y:2017 03 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $320 $752 Not Implemented
IP0078 # 04 Y:2017 04 2017 INSTALL OCCUPANCY SENSORS $1,354 $3,396 Implemented
IP0077 # 01 Y:2017 01 2017 REDUCE VENTILATION AIR $808 $30 Not Implemented