IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

168

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0139 # 04 Y:2020 04 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $647 $1,350 Implemented
IP0139 # 03 Y:2020 03 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $84,001 $51,911 Implemented
IP0139 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,551 $36 Implemented
IP0139 # 01 Y:2020 01 2020 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,243 $0 Implemented
IP0138 # 06 Y:2020 06 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,582 $32,713 Not Implemented
IP0138 # 05 Y:2020 05 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,920 $3,260 Not Implemented
IP0138 # 04 Y:2020 04 2020 RECOVER WASTE HEAT FROM EQUIPMENT $6,110 $4,000 Not Implemented
IP0138 # 03 Y:2020 03 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $7,178 $425 Not Implemented
IP0138 # 02 Y:2020 02 2020 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $296 $0 Not Implemented
IP0138 # 01 Y:2020 01 2020 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,642 $0 Not Implemented
IP0137 # 06 Y:2020 06 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $789 $1,348 Implemented
IP0137 # 05 Y:2020 05 2020 USE PHOTOCELL CONTROLS $184 $138 Not Implemented
IP0137 # 04 Y:2020 04 2020 RECOVER WASTE HEAT FROM EQUIPMENT $6,117 $2,100 Implemented
IP0137 # 03 Y:2020 03 2020 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $64,260 $1,554 Not Implemented
IP0137 # 02 Y:2020 02 2020 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $609 $0 Implemented
IP0137 # 01 Y:2020 01 2020 TURN OFF EQUIPMENT WHEN NOT IN USE $2,249 $0 Implemented
IP0136 # 07 Y:2020 07 2020 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $2,172 $8,600 Implemented
IP0136 # 06 Y:2020 06 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $27,563 $32,451 Implemented
IP0136 # 05 Y:2020 05 2020 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $12,685 $10,860 Implemented
IP0136 # 04 Y:2020 04 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,455 $69 Implemented
IP0136 # 03 Y:2020 03 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,490 $131 Not Implemented
IP0136 # 02 Y:2020 02 2020 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $921 $0 Implemented
IP0136 # 01 Y:2020 01 2020 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $672 $0 Implemented
IP0137 # 07 Y:2020 07 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,777 $4,138 Implemented
IP0137 # 08 Y:2020 08 2020 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT $14,497 $39,760 Not Implemented