IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

108

matching recommendations
Reset
SIC 201 Meat Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0217 # 04 Y:1987 04 1987 INSTALL AUTOMATIC STACK DAMPER $5,647 $700 Not Implemented
KU0217 # 05 Y:1987 05 1987 INSTALL TURBULATORS $8,520 $6,627 Not Implemented
KU0217 # 06 Y:1987 06 1987 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $549 $500 Implemented
KU0217 # 07 Y:1987 07 1987 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,186 $4,170 Implemented
KU0217 # 08 Y:1987 08 1987 IMPROVE LUBRICATION PRACTICES $1,376 $700 Not Implemented
KU0217 # 09 Y:1987 09 1987 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,661 $300 Implemented
KU0217 # 10 Y:1987 10 1987 UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING $19,971 $15,800 Not Implemented
KU0172 # 01 Y:1985 01 1985 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE $93,600 $40,000 Not Implemented
KU0172 # 02 Y:1985 02 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,410 $3,270 Implemented
KU0172 # 03 Y:1985 03 1985 AIR CONDITION ONLY SPACE NECESSARY $784 $350 Not Implemented
KU0172 # 04 Y:1985 04 1985 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE $451 $0 Not Implemented
KU0172 # 05 Y:1985 05 1985 INSTALL TIMERS AND/OR THERMOSTATS $345 $34 Implemented
KU0119 # 01 Y:1984 01 1984 RECOVER WASTE HEAT FROM EQUIPMENT $21,545 $16,000 Implemented
KU0119 # 02 Y:1984 02 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,576 $5,000 Not Implemented
KU0119 # 03 Y:1984 03 1984 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $4,583 $7,400 Not Implemented
KU0119 # 04 Y:1984 04 1984 INSTALL / REPAIR INSULATION ON STEAM LINES $4,150 $3,590 Implemented
KU0119 # 05 Y:1984 05 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,365 $3,208 Not Implemented
KU0119 # 06 Y:1984 06 1984 INSTALL TURBULATORS $2,558 $1,261 Not Implemented
KU0119 # 07 Y:1984 07 1984 OPERATE BOILERS ON HIGH FIRE SETTING $2,034 $50 Implemented
KU0119 # 08 Y:1984 08 1984 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $1,240 $0 Implemented
KU0119 # 09 Y:1984 09 1984 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $982 $200 Implemented
KU0119 # 10 Y:1984 10 1984 USE MINIMUM STEAM OPERATING PRESSURE $939 $0 Not Implemented
KU0119 # 11 Y:1984 11 1984 INSTALL TIMERS AND/OR THERMOSTATS $486 $465 Not Implemented
KU0119 # 12 Y:1984 12 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $393 $50 Implemented
KU0119 # 13 Y:1984 13 1984 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $288 $120 Not Implemented