IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

149

matching recommendations
Reset
SIC 28 Chemicals And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0450 # 07 Y:2010 07 2010 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $180 $150 Implemented
IA0450 # 08 Y:2010 08 2010 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $711 $500 Not Implemented
IA0450 # 06 Y:2010 06 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,382 $250 Implemented
IA0450 # 05 Y:2010 05 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,496 $20 Implemented
IA0450 # 04 Y:2010 04 2010 RECOVER WASTE HEAT FROM EQUIPMENT $1,759 $660 Not Implemented
IA0450 # 03 Y:2010 03 2010 INSTALL OCCUPANCY SENSORS $888 $2,230 Implemented
IA0450 # 02 Y:2010 02 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,373 $3,784 Implemented
IA0450 # 01 Y:2010 01 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,207 $29,505 Implemented
IA0450 # 09 Y:2010 09 2010 METER WASTE WATER $794 $1,000 Not Implemented
IA0450 # 10 Y:2010 10 2010 REDUCE VENTILATION AIR $4,542 $2,000 Not Implemented
OK0786 # 02 Y:2010 02 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $106 $604 Not Implemented
OK0786 # 06 Y:2010 06 2010 CHECK FOR ACCURACY OF UTILITY / POWER METERS $903 $0 Implemented
OK0786 # 04 Y:2010 04 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $854 $0 Implemented
OK0786 # 03 Y:2010 03 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $453 $3,410 Not Implemented
OK0786 # 05 Y:2010 05 2010 INSTALL TIMERS AND/OR THERMOSTATS $1,491 $465 Implemented
OK0786 # 01 Y:2010 01 2010 OPERATE BOILERS ON HIGH FIRE SETTING $2,348 $24,000 Not Implemented
OK0751 # 01 Y:2007 01 2007 RECOVER WASTE HEAT FROM EQUIPMENT $2,572 $2,401 Not Implemented
OK0751 # 02 Y:2007 02 2007 $59,692 $201,700 Not Implemented
OK0751 # 03 Y:2007 03 2007 $2,188 $200 Not Implemented
KU0361 # 05 Y:1992 05 1992 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $408 $480 Implemented
KU0361 # 06 Y:1992 06 1992 INSTALL SET-BACK TIMERS $288 $330 Not Implemented
KU0361 # 08 Y:1992 08 1992 RECOVER WASTE HEAT FROM EQUIPMENT $832 $500 Implemented
KU0361 # 01 Y:1992 01 1992 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $1,475 $6,000 Not Implemented
KU0361 # 02 Y:1992 02 1992 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $701 $0 Implemented
KU0361 # 03 Y:1992 03 1992 RECOVER WASTE HEAT FROM EQUIPMENT $375 $520 Implemented