IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

27

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0925 # 10 Y:2015 10 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,128 $65,326 Not Implemented
OK0925 # 09 Y:2015 09 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,024 $10,944 Not Implemented
OK0925 # 08 Y:2015 08 2015 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $3,748 $9,360 Not Implemented
OK0925 # 07 Y:2015 07 2015 IMPROVE CLEANING EFFICIENCY BY MAINTAINING CLEANING SYSTEM $6,933 $5,596 Implemented
OK0925 # 06 Y:2015 06 2015 USE COMPRESSOR AIR FILTERS $757 $362 Implemented
OK0925 # 05 Y:2015 05 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $278 $229 Not Implemented
OK0925 # 04 Y:2015 04 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,762 $933 Implemented
OK0925 # 03 Y:2015 03 2015 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $160 $214 Implemented
OK0925 # 02 Y:2015 02 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,930 $9,328 Not Implemented
OK0925 # 01 Y:2015 01 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,255 $71,792 Not Implemented
OK0925 # 11 Y:2015 11 2015 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $5,100 $9,690 Not Implemented
MZ0190 # 02 Y:2015 02 2015 CONDENSE OPERATION INTO ONE BUILDING $12,608 $0 Not Implemented
MZ0190 # 08 Y:2015 08 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,028 $1,500 Not Implemented
MZ0190 # 07 Y:2015 07 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,483 $860 Implemented
MZ0190 # 06 Y:2015 06 2015 ELIMINATE/REDUCE AN OPERATION $928 $0 Not Implemented
MZ0190 # 05 Y:2015 05 2015 RECOVER WASTE HEAT FROM EQUIPMENT $3,663 $1,500 Not Implemented
MZ0190 # 04 Y:2015 04 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,095 $3,500 Not Implemented
MZ0190 # 03 Y:2015 03 2015 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $20,868 $40,000 Not Implemented
MZ0190 # 01 Y:2015 01 2015 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $36,633 $120,000 Not Implemented
OK0913 # 05 Y:2015 05 2015 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $2,525 $9,000 Not Implemented
OK0913 # 06 Y:2015 06 2015 UPGRADE CONTROLS ON COMPRESSORS $1,330 $85 Not Implemented
OK0913 # 07 Y:2015 07 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $399 $133 Implemented
OK0913 # 04 Y:2015 04 2015 INSTALL TIMERS AND/OR THERMOSTATS $3,806 $1,000 Implemented
OK0913 # 03 Y:2015 03 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,931 $23,184 Not Implemented
OK0913 # 02 Y:2015 02 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,311 $1,578 Not Implemented