Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
85
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KU0484 # 06 Y:1997 | 06 | 1997 | INSTALL OCCUPANCY SENSORS | $320 | $400 | Not Implemented |
KU0484 # 03 Y:1997 | 03 | 1997 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $6,370 | $24,290 | Implemented |
KU0484 # 05 Y:1997 | 05 | 1997 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,270 | $1,350 | Not Implemented |
KU0484 # 04 Y:1997 | 04 | 1997 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,410 | $640 | Not Implemented |
KU0484 # 01 Y:1997 | 01 | 1997 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $9,050 | $26,400 | Not Implemented |
KU0484 # 07 Y:1997 | 07 | 1997 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $7,660 | $0 | Implemented |
KU0484 # 02 Y:1997 | 02 | 1997 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $7,770 | $14,200 | Implemented |
KU0484 # 08 Y:1997 | 08 | 1997 | USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES | $310 | $1,050 | Not Implemented |
KU0484 # 09 Y:1997 | 09 | 1997 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $18,220 | $4,200 | Implemented |
KU0481 # 06 Y:1997 | 06 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $980 | $1,440 | Not Implemented |
KU0481 # 03 Y:1997 | 03 | 1997 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $8,190 | $25,840 | Implemented |
KU0481 # 08 Y:1997 | 08 | 1997 | USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES | $298,910 | $17,200 | Not Implemented |
KU0481 # 02 Y:1997 | 02 | 1997 | INSULATE BARE EQUIPMENT | $24,670 | $27,000 | Implemented |
KU0481 # 01 Y:1997 | 01 | 1997 | UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM | $30,340 | $21,800 | Not Implemented |
KU0481 # 07 Y:1997 | 07 | 1997 | USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES | $5,460 | $16,500 | Implemented |
KU0481 # 04 Y:1997 | 04 | 1997 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,890 | $650 | Not Implemented |
KU0481 # 05 Y:1997 | 05 | 1997 | INSTALL OCCUPANCY SENSORS | $2,780 | $1,500 | Implemented |
OK0530 # 01 Y:1997 | 01 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,605 | $0 | n/a |
OK0530 # 02 Y:1997 | 02 | 1997 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $4,324 | $7,801 | n/a |
OK0530 # 05 Y:1997 | 05 | 1997 | USE BATCH FIRING WITH KILN "FURNITURE" SPECIFICALLY DESIGNED | $172 | $0 | n/a |
OK0530 # 07 Y:1997 | 07 | 1997 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $548 | $1,040 | n/a |
OK0530 # 06 Y:1997 | 06 | 1997 | MOVE PRODUCT USING MECHANICAL MEANS | $24,230 | $60,000 | n/a |
OK0530 # 04 Y:1997 | 04 | 1997 | INSTALL SET-BACK TIMERS | $734 | $252 | n/a |
OK0530 # 08 Y:1997 | 08 | 1997 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $4,096 | $8,570 | n/a |
OK0530 # 03 Y:1997 | 03 | 1997 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $594 | $548 | n/a |