IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

115

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0536 # 06 Y:1999 06 1999 IMPROVE SPACE COMFORT CONDITIONING $34,860 $75,000 n/a
KU0536 # 01 Y:1999 01 1999 REPLACE BOILER $10,770 $29,000 n/a
KU0536 # 03 Y:1999 03 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,240 $23,220 n/a
KU0536 # 02 Y:1999 02 1999 USE IMMERSION HEATING IN TANKS, MELTING POTS, ETC $8,260 $37,800 n/a
KU0536 # 04 Y:1999 04 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,450 $5,290 n/a
KU0536 # 05 Y:1999 05 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $370 $40 n/a
KU0532 # 07 Y:1999 07 1999 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $12,150 $11,640 Not Implemented
KU0532 # 03 Y:1999 03 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $7,060 $12,170 Implemented
KU0532 # 05 Y:1999 05 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $260 $360 Implemented
KU0532 # 06 Y:1999 06 1999 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $9,410 $14,000 Not Implemented
KU0532 # 01 Y:1999 01 1999 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $11,410 $17,000 Not Implemented
KU0532 # 04 Y:1999 04 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $700 $450 Implemented
KU0532 # 02 Y:1999 02 1999 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $8,040 $20,000 Implemented
KU0532 # 08 Y:1999 08 1999 RECYCLE CLEANING SOLVENT AND REUSE $2,620 $800 Implemented
KU0528 # 05 Y:1999 05 1999 INSULATE BARE EQUIPMENT $3,690 $4,240 n/a
KU0528 # 03 Y:1999 03 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,110 $20,590 n/a
KU0528 # 07 Y:1999 07 1999 $6,860 $1,280 n/a
KU0528 # 04 Y:1999 04 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,290 $920 n/a
KU0528 # 01 Y:1999 01 1999 USE IMMERSION HEATING IN TANKS, MELTING POTS, ETC $37,560 $66,040 n/a
KU0528 # 08 Y:1999 08 1999 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $3,290 $2,800 n/a
KU0528 # 06 Y:1999 06 1999 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE $16,430 $9,300 n/a
KU0528 # 02 Y:1999 02 1999 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $17,330 $800 n/a
KU0525 # 03 Y:1999 03 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $170 $350 Not Implemented
KU0525 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $860 $1,110 Not Implemented
KU0525 # 02 Y:1999 02 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $480 $800 Not Implemented