IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

59

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0889 # 04 Y:2014 04 2014 REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS $4,444 $6,994 Not Implemented
OK0889 # 03 Y:2014 03 2014 INSTALL TIMERS AND/OR THERMOSTATS $10,189 $4,650 Implemented
OK0889 # 02 Y:2014 02 2014 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $4,415 $7,547 Not Implemented
OK0889 # 01 Y:2014 01 2014 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $15,746 $14,500 Not Implemented
OK0889 # 10 Y:2014 10 2014 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $2,920 $10,599 Implemented
OK0889 # 09 Y:2014 09 2014 INSTALL / REPAIR INSULATION ON STEAM LINES $1,124 $239 Implemented
OK0889 # 11 Y:2014 11 2014 OPTIMIZE PLANT POWER FACTOR $4,264 $2,925 Not Implemented
OK0889 # 05 Y:2014 05 2014 INSTALL OCCUPANCY SENSORS $1,519 $5,372 Not Implemented
OK0889 # 06 Y:2014 06 2014 INSTALL OCCUPANCY SENSORS $200 $696 Not Implemented
OK0889 # 07 Y:2014 07 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,946 $320 Not Implemented
OK0889 # 08 Y:2014 08 2014 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $815 $250 Not Implemented
OK0888 # 07 Y:2014 07 2014 RECOVER WASTE HEAT FROM EQUIPMENT $52,633 $210,000 Not Implemented
OK0888 # 09 Y:2014 09 2014 OPTIMIZE PLANT POWER FACTOR $9,969 $6,825 Not Implemented
OK0888 # 01 Y:2014 01 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,503 $1,800 Implemented
OK0888 # 02 Y:2014 02 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,709 $0 Not Implemented
OK0888 # 06 Y:2014 06 2014 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $6,388 $4,000 Implemented
OK0888 # 08 Y:2014 08 2014 USE RADIANT HEATER FOR SPOT HEATING $1,977 $0 Implemented
OK0888 # 04 Y:2014 04 2014 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $13,683 $6,800 Implemented
OK0888 # 05 Y:2014 05 2014 INSULATE BARE EQUIPMENT $843 $1,390 Not Implemented
OK0888 # 03 Y:2014 03 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $709 $1,293 Not Implemented
OK0894 # 01 Y:2014 01 2014 RECOVER WASTE HEAT FROM EQUIPMENT $13,657 $2,756 Not Implemented
OK0894 # 02 Y:2014 02 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,810 $800 Not Implemented
OK0894 # 03 Y:2014 03 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,477 $1,442 Not Implemented
OK0894 # 04 Y:2014 04 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $853 $551 Implemented
OK0894 # 05 Y:2014 05 2014 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $543 $1,111 Implemented