Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
98
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0925 # 08 Y:2015 | 08 | 2015 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $3,748 | $9,360 | Not Implemented |
OK0925 # 07 Y:2015 | 07 | 2015 | IMPROVE CLEANING EFFICIENCY BY MAINTAINING CLEANING SYSTEM | $6,933 | $5,596 | Implemented |
OK0925 # 03 Y:2015 | 03 | 2015 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $160 | $214 | Implemented |
OK0925 # 09 Y:2015 | 09 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $14,024 | $10,944 | Not Implemented |
OK0925 # 04 Y:2015 | 04 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,762 | $933 | Implemented |
OK0925 # 10 Y:2015 | 10 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,128 | $65,326 | Not Implemented |
OK0925 # 05 Y:2015 | 05 | 2015 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $278 | $229 | Not Implemented |
OK0925 # 01 Y:2015 | 01 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,255 | $71,792 | Not Implemented |
OK0925 # 06 Y:2015 | 06 | 2015 | USE COMPRESSOR AIR FILTERS | $757 | $362 | Implemented |
OK0925 # 11 Y:2015 | 11 | 2015 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $5,100 | $9,690 | Not Implemented |
OK0925 # 02 Y:2015 | 02 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,930 | $9,328 | Not Implemented |
OK0924 # 07 Y:2015 | 07 | 2015 | INSTALL REPLACEMENT DOORS | $334 | $1,108 | Not Implemented |
MZ0190 # 01 Y:2015 | 01 | 2015 | REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT | $36,633 | $120,000 | Not Implemented |
OK0924 # 04 Y:2015 | 04 | 2015 | AIR CONDITION ONLY SPACE NECESSARY | $408 | $1,137 | Implemented |
OK0924 # 06 Y:2015 | 06 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,674 | $0 | Implemented |
OK0924 # 02 Y:2015 | 02 | 2015 | INSTALL OCCUPANCY SENSORS | $1,467 | $3,653 | Implemented |
OK0924 # 01 Y:2015 | 01 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,037 | $21,108 | Implemented |
OK0924 # 05 Y:2015 | 05 | 2015 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,732 | $1,220 | Not Implemented |
OK0924 # 03 Y:2015 | 03 | 2015 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $309 | $0 | Implemented |
MZ0190 # 08 Y:2015 | 08 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,028 | $1,500 | Not Implemented |
MZ0190 # 07 Y:2015 | 07 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,483 | $860 | Implemented |
MZ0190 # 06 Y:2015 | 06 | 2015 | ELIMINATE/REDUCE AN OPERATION | $928 | $0 | Not Implemented |
MZ0190 # 05 Y:2015 | 05 | 2015 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,663 | $1,500 | Not Implemented |
MZ0190 # 04 Y:2015 | 04 | 2015 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,095 | $3,500 | Not Implemented |
MZ0190 # 03 Y:2015 | 03 | 2015 | DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS | $20,868 | $40,000 | Not Implemented |