IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

190

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0370 # 02 Y:1992 02 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,376 $1,450 Implemented
KU0370 # 03 Y:1992 03 1992 RECOVER WASTE HEAT FROM EQUIPMENT $527 $0 Implemented
KU0370 # 04 Y:1992 04 1992 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $313 $1,000 Implemented
KU0370 # 05 Y:1992 05 1992 REDUCE OR ELIMINATE WASTE $999 $0 Not Implemented
KU0370 # 06 Y:1992 06 1992 REDUCE VENTILATION AIR $243 $650 Not Implemented
KU0371 # 01 Y:1992 01 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,723 $850 Implemented
KU0371 # 02 Y:1992 02 1992 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,986 $300 Not Implemented
KU0371 # 03 Y:1992 03 1992 INSULATE BARE EQUIPMENT $1,732 $4,032 Not Implemented
KU0371 # 04 Y:1992 04 1992 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,300 $949 Not Implemented
KU0371 # 05 Y:1992 05 1992 INSTALL SET-BACK TIMERS $365 $760 Not Implemented
KU0371 # 06 Y:1992 06 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $57 $0 Implemented
KU0365 # 01 Y:1992 01 1992 USE ONLY AMOUNT OF AIR NECESSARY TO PREVENT EXPLOSION HAZARD $13,442 $0 Not Implemented
KU0365 # 02 Y:1992 02 1992 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $6,266 $31,766 Implemented
KU0365 # 03 Y:1992 03 1992 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,768 $887 Implemented
KU0365 # 04 Y:1992 04 1992 INSTALL SET-BACK TIMERS $873 $870 Not Implemented
KU0365 # 05 Y:1992 05 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,302 $540 Implemented
KU0365 # 06 Y:1992 06 1992 RECOVER WASTE HEAT FROM EQUIPMENT $400 $900 Not Implemented
KU0365 # 07 Y:1992 07 1992 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $397 $250 Implemented
KU0365 # 08 Y:1992 08 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $254 $160 Not Implemented
KU0366 # 01 Y:1992 01 1992 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $3,148 $6,400 Not Implemented
KU0366 # 02 Y:1992 02 1992 INSTALL TIMERS AND/OR THERMOSTATS $1,539 $760 Not Implemented
KU0366 # 03 Y:1992 03 1992 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $830 $150 Not Implemented
KU0366 # 04 Y:1992 04 1992 INSTALL TURBULATORS $621 $1,320 Not Implemented
KU0366 # 05 Y:1992 05 1992 KEEP BOILER TUBES CLEAN $559 $450 Not Implemented
KU0366 # 06 Y:1992 06 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $694 $200 Not Implemented