IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations

2,567

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UK2005 # 09 Y:2021 09 2021 INSULATE BARE EQUIPMENT $4,993 $6,721 n/a
UK2004 # 01 Y:2020 01 2020 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $6,031 $21,360 Implemented
UK2004 # 02 Y:2020 02 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,779 $0 Implemented
UK2004 # 03 Y:2020 03 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,067 $2,630 Implemented
UK2004 # 04 Y:2020 04 2020 INCREASE AMOUNT OF CONDENSATE RETURNED $360,000 $250,000 Implemented
UK2004 # 05 Y:2020 05 2020 INSULATE BARE EQUIPMENT $52,668 $24,890 Implemented
UK2004 # 06 Y:2020 06 2020 PREHEAT COMBUSTION AIR WITH WASTE HEAT $71,487 $150,900 Implemented
UK2004 # 07 Y:2020 07 2020 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $102,672 $4,000 Implemented
UK2004 # 08 Y:2020 08 2020 ELIMINATE A BY-PRODUCT $293,614 $53,800 Not Implemented
UK2004 # 09 Y:2020 09 2020 OPTIMIZE PLANT POWER FACTOR $40,258 $23,660 Implemented
UK2003 # 01 Y:2020 01 2020 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $486 $2,200 Not Implemented
UK2003 # 02 Y:2020 02 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $660 $0 Not Implemented
UK2003 # 03 Y:2020 03 2020 REDUCE VENTILATION AIR $5,372 $4,560 Not Implemented
UK2003 # 04 Y:2020 04 2020 INSULATE BARE EQUIPMENT $4,628 $1,586 Implemented
UK2003 # 05 Y:2020 05 2020 PREHEAT COMBUSTION AIR WITH WASTE HEAT $15,645 $28,100 Implemented
UK2003 # 06 Y:2020 06 2020 OPTIMIZE PLANT POWER FACTOR $10,287 $6,825 Not Implemented
UK2003 # 07 Y:2020 07 2020 MINIMIZE WATER USAGE $27,840 $15,000 Implemented
UK2002 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,770 $2,473 Implemented
UK2002 # 02 Y:2020 02 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $473 $160 Implemented
UK2002 # 03 Y:2020 03 2020 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE $800 $0 Not Implemented
UK2002 # 04 Y:2020 04 2020 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $460 $0 Not Implemented
UK2002 # 05 Y:2020 05 2020 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $17,165 $0 Implemented
UK2001 # 01 Y:2020 01 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,076 $2,010 Implemented
UK2001 # 02 Y:2020 02 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,413 $0 Not Implemented
UK2001 # 03 Y:2020 03 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,887 $9,378 Implemented