IAC logo
Search IAC Recommendations
Sponsored by:
EERE AMO
IAC logo
Search IAC Recommendations

2,547

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UK1915 # 03 Y:2019 03 2019 INSTALL OCCUPANCY SENSORS $259 $260 n/a
UK1915 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,983 $21,695 n/a
UK1915 # 05 Y:2019 05 2019 REPLACE TREATED WATER WITH WELL / SURFACE WATER $53,903 $10,200 n/a
UK1915 # 06 Y:2019 06 2019 INSULATE BARE EQUIPMENT $13,534 $26,305 n/a
UK1915 # 07 Y:2019 07 2019 OPTIMIZE PLANT POWER FACTOR $127,719 $54,495 n/a
UK1914 # 01 Y:2019 01 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $642 $2,510 n/a
UK1914 # 02 Y:2019 02 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,217 $1,100 n/a
UK1914 # 03 Y:2019 03 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $394 $0 n/a
UK1914 # 04 Y:2019 04 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,233 $8,100 n/a
UK1914 # 05 Y:2019 05 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $8,187 $0 n/a
UK1914 # 06 Y:2019 06 2019 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $4,746 $1,370 n/a
UK1914 # 07 Y:2019 07 2019 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $150 $0 n/a
UK1914 # 08 Y:2019 08 2019 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $145 $80 n/a
UK1914 # 09 Y:2019 09 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,556 $21,155 n/a
UK1914 # 10 Y:2019 10 2019 OPTIMIZE PLANT POWER FACTOR $14,446 $12,425 n/a
UK1913 # 01 Y:2019 01 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,855 $2,510 Implemented
UK1913 # 02 Y:2019 02 2019 UPGRADE CONTROLS ON COMPRESSORS $5,474 $16,000 Not Implemented
UK1913 # 03 Y:2019 03 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,642 $2,520 Implemented
UK1913 # 04 Y:2019 04 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,111 $550 Implemented
UK1913 # 05 Y:2019 05 2019 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $632 $62 Not Implemented
UK1913 # 06 Y:2019 06 2019 INSTALL OCCUPANCY SENSORS $333 $1,120 Implemented
UK1913 # 07 Y:2019 07 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,770 $32,561 Implemented
UK1913 # 08 Y:2019 08 2019 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $243 $127 Implemented
UK1913 # 09 Y:2019 09 2019 INSULATE BARE EQUIPMENT $8,076 $3,569 Not Implemented
UK1913 # 10 Y:2019 10 2019 OPTIMIZE PLANT POWER FACTOR $15,097 $10,570 Implemented