Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,876
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UL2506 # 05 Y:2025 | 05 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $13,709 | $151,700 | n/a |
UL2506 # 02 Y:2025 | 02 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,455 | $2,940 | n/a |
UL2506 # 01 Y:2025 | 01 | 2025 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $77,396 | $40,000 | n/a |
UL2506 # 03 Y:2025 | 03 | 2025 | USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER | $43,343 | $86,469 | n/a |
UL2506 # 04 Y:2025 | 04 | 2025 | OPTIMIZE PLANT POWER FACTOR | $49,775 | $25,480 | n/a |
UL2506 # 06 Y:2025 | 06 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,323 | $17,116 | n/a |
UL2504 # 06 Y:2025 | 06 | 2025 | UPGRADE OBSOLETE EQUIPMENT | $17,226 | $135,000 | n/a |
UL2504 # 08 Y:2025 | 08 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $601 | $2,445 | n/a |
UL2504 # 01 Y:2025 | 01 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $223 | $168 | n/a |
UL2504 # 05 Y:2025 | 05 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $18,944 | $219,965 | n/a |
UL2504 # 03 Y:2025 | 03 | 2025 | USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER | $10,447 | $57,490 | n/a |
UL2504 # 04 Y:2025 | 04 | 2025 | OPTIMIZE PLANT POWER FACTOR | $45,536 | $20,280 | n/a |
UL2504 # 02 Y:2025 | 02 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,017 | $630 | n/a |
UL2504 # 07 Y:2025 | 07 | 2025 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $4,512 | $0 | n/a |
UL2503 # 01 Y:2025 | 01 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,701 | $2,100 | n/a |
UL2503 # 05 Y:2025 | 05 | 2025 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,094 | $7,500 | n/a |
UL2503 # 04 Y:2025 | 04 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $53,722 | $482,406 | n/a |
UL2503 # 02 Y:2025 | 02 | 2025 | OPTIMIZE PLANT POWER FACTOR | $6,739 | $14,223 | n/a |
UL2503 # 03 Y:2025 | 03 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,129 | $32,120 | n/a |
UL2502 # 01 Y:2025 | 01 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,810 | $2,205 | n/a |
UL2502 # 08 Y:2025 | 08 | 2025 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $8,276 | $1,800 | n/a |
UL2502 # 02 Y:2025 | 02 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,066 | $0 | n/a |
UL2502 # 05 Y:2025 | 05 | 2025 | INSTALL OCCUPANCY SENSORS | $753 | $155 | n/a |
UL2502 # 07 Y:2025 | 07 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $74,556 | $570,771 | n/a |
UL2502 # 04 Y:2025 | 04 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $94 | $35 | n/a |