Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
64
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UK2105 # 09 Y:2021 | 09 | 2021 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $1,619 | $644 | n/a |
UK2105 # 10 Y:2021 | 10 | 2021 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $1,248 | $1,000 | n/a |
UK2105 # 11 Y:2021 | 11 | 2021 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $4,807 | $400 | n/a |
UK2104 # 06 Y:2021 | 06 | 2021 | REDESIGN PROCESS | $16,187 | $25,000 | n/a |
UK2104 # 10 Y:2021 | 10 | 2021 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $356 | $78 | n/a |
UK2104 # 09 Y:2021 | 09 | 2021 | REPLACE TREATED WATER WITH WELL / SURFACE WATER | $13,774 | $4,000 | n/a |
UK2104 # 08 Y:2021 | 08 | 2021 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $21,003 | $0 | n/a |
UK2104 # 07 Y:2021 | 07 | 2021 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $10,415 | $13,780 | n/a |
UK2104 # 05 Y:2021 | 05 | 2021 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $26,160 | $9,000 | n/a |
UK2104 # 04 Y:2021 | 04 | 2021 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $85 | $285 | n/a |
UK2104 # 03 Y:2021 | 03 | 2021 | INSTALL OCCUPANCY SENSORS | $231 | $650 | n/a |
UK2104 # 02 Y:2021 | 02 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,021 | $2,633 | n/a |
UK2104 # 01 Y:2021 | 01 | 2021 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,514 | $444 | n/a |
UK2103 # 04 Y:2021 | 04 | 2021 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $328 | $0 | n/a |
UK2103 # 03 Y:2021 | 03 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,386 | $4,128 | n/a |
UK2103 # 02 Y:2021 | 02 | 2021 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $54 | $63 | n/a |
UK2103 # 01 Y:2021 | 01 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $51,422 | $0 | n/a |
UK2101 # 04 Y:2021 | 04 | 2021 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $8,953 | $2,145 | n/a |
UK2101 # 05 Y:2021 | 05 | 2021 | RECOVER WASTE HEAT FROM EQUIPMENT | $6,495 | $2,215 | n/a |
UK2101 # 06 Y:2021 | 06 | 2021 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $16,094 | $170 | n/a |
UK2101 # 02 Y:2021 | 02 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $68,186 | $12,380 | n/a |
UK2101 # 01 Y:2021 | 01 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,574 | $6,800 | n/a |
UK2101 # 11 Y:2021 | 11 | 2021 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,883 | $0 | n/a |
UK2101 # 12 Y:2021 | 12 | 2021 | COMBINE UTILITY METERS | $72,182 | $150,000 | n/a |
UK2101 # 13 Y:2021 | 13 | 2021 | USE SOLAR HEAT TO MAKE ELECTRICTY | $171,872 | $1,684,348 | n/a |