IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

318

matching recommendations
Reset
SIC 308 Miscellaneous Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0255 # 09 Y:1992 09 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,209 $0 Implemented
MA0255 # 10 Y:1992 10 1992 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $200 $300 Implemented
MA0255 # 11 Y:1992 11 1992 COVER OPEN TANKS $181 $285 Not Implemented
MA0236 # 01 Y:1992 01 1992 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $38,284 $0 Not Implemented
MA0236 # 02 Y:1992 02 1992 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $35,797 $1,500 Implemented
MA0236 # 03 Y:1992 03 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $686 $2 Implemented
MA0212 # 01 Y:1991 01 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,099 $2,649 Implemented
MA0212 # 02 Y:1991 02 1991 INSULATE BARE EQUIPMENT $3,090 $3,593 Implemented
MA0212 # 03 Y:1991 03 1991 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,737 $9,055 Implemented
MA0212 # 04 Y:1991 04 1991 DISCONNECT BALLASTS $1,580 $1,875 Implemented
MA0212 # 05 Y:1991 05 1991 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,665 $5,000 Implemented
MA0212 # 06 Y:1991 06 1991 INSTALL SET-BACK TIMERS $393 $161 Implemented
MA0212 # 07 Y:1991 07 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $14,146 $79,350 Implemented
MA0212 # 09 Y:1991 09 1991 OPTIMIZE PLANT POWER FACTOR $6,858 $0 Implemented
MA0204 # 01 Y:1991 01 1991 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $7,629 $0 Not Implemented
MA0204 # 02 Y:1991 02 1991 INSULATE BARE EQUIPMENT $12,296 $3,400 Not Implemented
MA0204 # 03 Y:1991 03 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,632 $46,085 Not Implemented
MA0204 # 04 Y:1991 04 1991 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $13,064 $11,160 Not Implemented
MA0204 # 05 Y:1991 05 1991 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,027 $31,600 Not Implemented
MA0204 # 06 Y:1991 06 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $557 $48 Not Implemented
MA0196 # 01 Y:1990 01 1990 INSULATE BARE EQUIPMENT $583 $381 Not Implemented
MA0196 # 02 Y:1990 02 1990 INCREASE AMOUNT OF CONDENSATE RETURNED $9,178 $2,409 Not Implemented
MA0196 # 03 Y:1990 03 1990 BURN WASTE OIL FOR HEAT $2,531 $559 Not Implemented
MA0196 # 04 Y:1990 04 1990 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,856 $0 Not Implemented
MA0196 # 05 Y:1990 05 1990 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,134 $2,460 Not Implemented