IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

204

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0365 # 03 Y:1996 03 1996 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,539 $840 Implemented
MA0365 # 04 Y:1996 04 1996 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $4,290 $0 Implemented
MA0365 # 05 Y:1996 05 1996 INSTALL / REPAIR INSULATION ON STEAM LINES $2,173 $876 Implemented
MA0365 # 07 Y:1996 07 1996 COMBINE UTILITY METERS $420 $0 Implemented
MA0321 # 01 Y:1995 01 1995 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $22,525 $60,000 Implemented
MA0321 # 03 Y:1995 03 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,493 $23,880 Implemented
MA0312 # 02 Y:1994 02 1994 USE DIRECT FLAME IMPINGEMENT OR INFRARED PROCESSING FOR CHAMBER TYPE HEATING $4,017 $80,000 Implemented
MA0312 # 04 Y:1994 04 1994 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $372 $1,094 Implemented
MA0312 # 05 Y:1994 05 1994 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME $3,394 $35,728 Implemented
MA0279 # 01 Y:1993 01 1993 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $11,082 $2,800 Implemented
MA0270 # 01 Y:1993 01 1993 INSULATE BARE EQUIPMENT $3,971 $4,811 Implemented
MA0270 # 02 Y:1993 02 1993 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,894 $0 Implemented
MA0270 # 03 Y:1993 03 1993 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $1,507 $390 Implemented
MA0270 # 04 Y:1993 04 1993 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,159 $400 Implemented
MA0240 # 01 Y:1992 01 1992 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $83,013 $80 Implemented
MA0240 # 03 Y:1992 03 1992 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $16,723 $11 Implemented
MA0240 # 04 Y:1992 04 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,460 $2,355 Implemented
MA0240 # 05 Y:1992 05 1992 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,896 $0 Implemented
MA0240 # 06 Y:1992 06 1992 INSTALL SET-BACK TIMERS $1,400 $400 Implemented
MA0240 # 07 Y:1992 07 1992 REPAIR OR REPLACE STEAM TRAPS $1,348 $240 Implemented
MA0240 # 08 Y:1992 08 1992 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $1,022 $2,200 Implemented
MA0186 # 01 Y:1990 01 1990 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $1,664 $5,000 Implemented
MA0186 # 03 Y:1990 03 1990 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $4,848 $500 Implemented
MA0186 # 04 Y:1990 04 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,333 $9,634 Implemented
MA0186 # 05 Y:1990 05 1990 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,130 $1,195 Implemented