Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
25
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0732 # 04 Y:2014 | 04 | 2014 | AIR CONDITION ONLY SPACE NECESSARY | $849 | $4,000 | Not Implemented |
MA0732 # 03 Y:2014 | 03 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,880 | $15,310 | Implemented |
MA0732 # 02 Y:2014 | 02 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,511 | $29,280 | Implemented |
MA0732 # 01 Y:2014 | 01 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,190 | $12,000 | Not Implemented |
MA0730 # 02 Y:2014 | 02 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,618 | $4,285 | Implemented |
MA0730 # 06 Y:2014 | 06 | 2014 | INSULATE BARE EQUIPMENT | $426 | $1,200 | Not Implemented |
MA0730 # 05 Y:2014 | 05 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $478 | $300 | Implemented |
MA0730 # 04 Y:2014 | 04 | 2014 | REDUCE VENTILATION AIR | $524 | $1,300 | Not Implemented |
MA0730 # 03 Y:2014 | 03 | 2014 | REDUCE VENTILATION AIR | $1,607 | $4,600 | Implemented |
MA0730 # 01 Y:2014 | 01 | 2014 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $18,229 | $5,000 | Not Implemented |
MA0731 # 01 Y:2014 | 01 | 2014 | USE EXISTING DAM TO GENERATE ELECTRICITY | $17,926 | $250,000 | Not Implemented |
MA0731 # 02 Y:2014 | 02 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,649 | $3,000 | Not Implemented |
MA0731 # 03 Y:2014 | 03 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,813 | $5,000 | Implemented |
MA0731 # 04 Y:2014 | 04 | 2014 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $729 | $300 | Not Implemented |
MA0729 # 06 Y:2014 | 06 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,173 | $200 | Implemented |
MA0729 # 05 Y:2014 | 05 | 2014 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,622 | $2,690 | Not Implemented |
MA0729 # 04 Y:2014 | 04 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,114 | $9,050 | Not Implemented |
MA0729 # 03 Y:2014 | 03 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,956 | $3,300 | Implemented |
MA0729 # 02 Y:2014 | 02 | 2014 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $14,490 | $500 | Implemented |
MA0729 # 01 Y:2014 | 01 | 2014 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $25,718 | $11,750 | Not Implemented |
MA0724 # 01 Y:2014 | 01 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $17,926 | $23,600 | Implemented |
MA0724 # 05 Y:2014 | 05 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,321 | $1,500 | Implemented |
MA0724 # 04 Y:2014 | 04 | 2014 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $3,430 | $10,000 | Not Implemented |
MA0724 # 03 Y:2014 | 03 | 2014 | OPTIMIZE PLANT POWER FACTOR | $3,816 | $5,322 | Not Implemented |
MA0724 # 02 Y:2014 | 02 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,941 | $11,100 | Not Implemented |