IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

41

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0288 # 05 Y:1993 05 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,263 $0 Implemented
MA0283 # 01 Y:1993 01 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,690 $435 Implemented
MA0283 # 02 Y:1993 02 1993 OPTIMIZE PLANT POWER FACTOR $3,380 $6,000 Implemented
MA0283 # 03 Y:1993 03 1993 RECOVER AND REUSE COOLING WATER $1,407 $200 Implemented
MA0283 # 05 Y:1993 05 1993 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $548 $151 Implemented
MA0283 # 06 Y:1993 06 1993 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $371 $400 Implemented
MA0281 # 03 Y:1993 03 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,920 $3,492 Implemented
MA0281 # 07 Y:1993 07 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $436 $0 Implemented
MA0281 # 04 Y:1993 04 1993 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,872 $400 Implemented
MA0281 # 05 Y:1993 05 1993 INSULATE BARE EQUIPMENT $1,812 $320 Implemented
MA0279 # 01 Y:1993 01 1993 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $11,082 $2,800 Implemented
MA0272 # 02 Y:1993 02 1993 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,741 $68 Implemented
MA0272 # 07 Y:1993 07 1993 INSULATE BARE EQUIPMENT $6,765 $167 Implemented
MA0272 # 01 Y:1993 01 1993 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $27,014 $49 Implemented
MA0272 # 03 Y:1993 03 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,507 $12,663 Implemented
MA0272 # 04 Y:1993 04 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $10,797 $0 Implemented
MA0275 # 02 Y:1993 02 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,019 $9,396 Implemented
MA0271 # 02 Y:1993 02 1993 INSTALL OCCUPANCY SENSORS $2,570 $510 Implemented
MA0271 # 03 Y:1993 03 1993 INSTALL SET-BACK TIMERS $482 $160 Implemented
MA0271 # 06 Y:1993 06 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $923 $0 Implemented
MA0270 # 01 Y:1993 01 1993 INSULATE BARE EQUIPMENT $3,971 $4,811 Implemented
MA0270 # 02 Y:1993 02 1993 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,894 $0 Implemented
MA0270 # 03 Y:1993 03 1993 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $1,507 $390 Implemented
MA0270 # 04 Y:1993 04 1993 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,159 $400 Implemented
MA0269 # 01 Y:1993 01 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,922 $21,677 Implemented