IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

52

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0764 # 02 Y:2016 02 2016 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $3,889 $5,000 Not Implemented
MA0764 # 03 Y:2016 03 2016 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $1,264 $500 Not Implemented
MA0764 # 01 Y:2016 01 2016 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $45,693 $125,000 Not Implemented
MA0761 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,969 $6,409 Not Implemented
MA0761 # 02 Y:2016 02 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,889 $2,685 Not Implemented
MA0761 # 01 Y:2016 01 2016 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $22,997 $134,000 Not Implemented
MA0761 # 04 Y:2016 04 2016 MINIMIZE WATER USAGE $3,035 $4,050 Not Implemented
MA0761 # 05 Y:2016 05 2016 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $864 $342 Not Implemented
MA0761 # 06 Y:2016 06 2016 OPTIMIZE PLANT POWER FACTOR $816 $2,000 Not Implemented
MA0759 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,476 $6,333 Implemented
MA0759 # 01 Y:2016 01 2016 REDUCE VENTILATION AIR $11,226 $14,820 Not Implemented
MA0759 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,502 $3,367 Implemented
MA0759 # 04 Y:2016 04 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $825 $6,402 Implemented
MA0756 # 06 Y:2016 06 2016 OPTIMIZE PLANT POWER FACTOR $576 $1,392 Not Implemented
MA0756 # 05 Y:2016 05 2016 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $1,508 $10,800 Not Implemented
MA0756 # 04 Y:2016 04 2016 REDUCE VENTILATION AIR $1,278 $1,000 Not Implemented
MA0756 # 03 Y:2016 03 2016 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,797 $7,000 Implemented
MA0756 # 02 Y:2016 02 2016 INSTALL OCCUPANCY SENSORS $6,277 $2,320 Not Implemented
MA0756 # 01 Y:2016 01 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,102 $6,500 Implemented
MA0754 # 02 Y:2016 02 2016 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $112,215 $1,000 Not Implemented
MA0754 # 03 Y:2016 03 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $71,309 $500,000 Not Implemented
MA0754 # 04 Y:2016 04 2016 INCREASE AMOUNT OF CONDENSATE RETURNED $62,104 $250,000 Not Implemented
MA0754 # 05 Y:2016 05 2016 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $34,769 $3,000 Implemented
MA0754 # 06 Y:2016 06 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $25,043 $13,895 Implemented
MA0754 # 07 Y:2016 07 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,913 $4,940 Implemented