IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

83

matching recommendations
Reset
NAICS 311 Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0066 # 06 Y:2011 06 2011 UPGRADE CONTROLS ON COMPRESSORS $12,600 $10,000 Not Implemented
DL0066 # 05 Y:2011 05 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,701 $1,257 Not Implemented
DL0066 # 04 Y:2011 04 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,015 $4,000 Implemented
DL0066 # 03 Y:2011 03 2011 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $2,460 $2,000 Implemented
DL0066 # 02 Y:2011 02 2011 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $101,455 $36,300 Not Implemented
DL0066 # 01 Y:2011 01 2011 RECOVER WASTE HEAT FROM EQUIPMENT $2,960 $1,035 Implemented
DL0029 # 05 Y:2008 05 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,700 $3,250 Not Implemented
DL0029 # 04 Y:2008 04 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $36,724 $75,600 Not Implemented
DL0029 # 03 Y:2008 03 2008 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $44,793 $11,000 Implemented
DL0029 # 02 Y:2008 02 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,326 $4,000 Implemented
DL0029 # 01 Y:2008 01 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,200 $500 Not Implemented
WV0328 # 04 Y:2005 04 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,040 $60 Implemented
WV0328 # 10 Y:2005 10 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $282 $1,530 Implemented
WV0328 # 09 Y:2005 09 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $397 $120 Implemented
WV0328 # 08 Y:2005 08 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $406 $430 Not Implemented
WV0328 # 07 Y:2005 07 2005 DEVELOP A REPAIR/REPLACE POLICY $646 $278 Implemented
WV0328 # 06 Y:2005 06 2005 USE SYNTHETIC LUBRICANT $649 $30 Not Implemented
WV0328 # 05 Y:2005 05 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $948 $0 Implemented
WV0328 # 03 Y:2005 03 2005 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $3,942 $18,000 Implemented
WV0328 # 02 Y:2005 02 2005 UTILIZE A LESS EXPENSIVE COOLING METHOD $4,992 $0 Not Implemented
WV0328 # 01 Y:2005 01 2005 $89,602 $72,720 Not Implemented
WV0277 # 10 Y:2003 10 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,044 $0 Not Implemented
WV0277 # 01 Y:2003 01 2003 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $110,201 $2,195 Not Implemented
WV0277 # 02 Y:2003 02 2003 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $10,711 $1,000 Implemented
WV0277 # 03 Y:2003 03 2003 MINIMIZE WATER USAGE $56,297 $17,800 Not Implemented