IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

92

matching recommendations
Reset
SIC 308 Miscellaneous Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0459 # 04 Y:2012 04 2012 INSULATE BARE EQUIPMENT $12,749 $12,121 Not Implemented
WV0459 # 13 Y:2012 13 2012 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $768 $1,188 Not Implemented
WV0459 # 12 Y:2012 12 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,301 $6,566 Not Implemented
WV0459 # 02 Y:2012 02 2012 UPGRADE CONTROLS ON COMPRESSORS $35,104 $17,900 Not Implemented
WV0459 # 07 Y:2012 07 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,273 $90 Implemented
DL0074 # 04 Y:2011 04 2011 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,870 $39,300 Not Implemented
DL0074 # 09 Y:2011 09 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $960 $300 Not Implemented
DL0074 # 08 Y:2011 08 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,345 $6,300 Not Implemented
DL0074 # 07 Y:2011 07 2011 RECOVER WASTE HEAT FROM EQUIPMENT $3,320 $1,900 Implemented
DL0074 # 06 Y:2011 06 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,380 $17,150 Not Implemented
DL0074 # 05 Y:2011 05 2011 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $13,165 $87,400 Not Implemented
DL0074 # 03 Y:2011 03 2011 KEEP EQUIPMENT CLEAN $9,770 $2,000 Implemented
DL0074 # 02 Y:2011 02 2011 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $12,050 $4,500 Implemented
DL0074 # 01 Y:2011 01 2011 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $6,390 $2,000 Implemented
DL0074 # 10 Y:2011 10 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $510 $1,300 Implemented
WV0405 # 11 Y:2010 11 2010 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $194 $0 Not Implemented
WV0405 # 04 Y:2010 04 2010 REDUCE VENTILATION AIR $1,892 $1,078 Implemented
WV0405 # 05 Y:2010 05 2010 DEVELOP A REPAIR/REPLACE POLICY $1,917 $804 Not Implemented
WV0405 # 06 Y:2010 06 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,359 $588 Implemented
WV0405 # 02 Y:2010 02 2010 USE RADIANT HEATER FOR SPOT HEATING $8,114 $4,540 Implemented
WV0405 # 03 Y:2010 03 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,475 $4,751 Implemented
WV0405 # 10 Y:2010 10 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $367 $27 Implemented
WV0405 # 01 Y:2010 01 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,129 $42,755 Implemented
WV0405 # 07 Y:2010 07 2010 UTILIZE A LESS EXPENSIVE COOLING METHOD $1,180 $10,000 Not Implemented
WV0405 # 08 Y:2010 08 2010 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $747 $1,000 Implemented