IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

992

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
RU0086 # 01 Y:1990 01 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,981 $21,083 Implemented
RU0086 # 02 Y:1990 02 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,121 $0 Implemented
RU0086 # 03 Y:1990 03 1990 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,143 $500 Implemented
RU0086 # 04 Y:1990 04 1990 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $15,885 $52,895 Implemented
RU0086 # 05 Y:1990 05 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,663 $350 Implemented
RU0086 # 06 Y:1990 06 1990 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,035 $38 Implemented
RU0086 # 07 Y:1990 07 1990 RECOVER WASTE HEAT FROM EQUIPMENT $17,528 $10,200 Implemented
RU0059 # 01 Y:1989 01 1989 REDESIGN PROCESS $81,076 $84,000 Not Implemented
RU0059 # 02 Y:1989 02 1989 OPTIMIZE PLANT POWER FACTOR $36,000 $39,000 Implemented
RU0059 # 03 Y:1989 03 1989 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $11,797 $16,740 Not Implemented
RU0059 # 04 Y:1989 04 1989 ISOLATE HOT OR COLD EQUIPMENT $6,424 $11,590 Not Implemented
RU0059 # 05 Y:1989 05 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,490 $479 Not Implemented
RU0060 # 01 Y:1989 01 1989 REPAIR AND ELIMINATE STEAM LEAKS $20,786 $0 Implemented
RU0060 # 02 Y:1989 02 1989 REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH $18,359 $16,835 Implemented
RU0060 # 03 Y:1989 03 1989 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $5,856 $6,900 Not Implemented
RU0060 # 04 Y:1989 04 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,256 $0 Implemented
RU0060 # 05 Y:1989 05 1989 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,180 $102 Implemented
RU0060 # 06 Y:1989 06 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,072 $1,500 Implemented
RU0042 # 01 Y:1988 01 1988 IMPROVE LUBRICATION PRACTICES $11,892 $800 Not Implemented
RU0042 # 02 Y:1988 02 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $16,798 $21,400 Not Implemented
RU0042 # 03 Y:1988 03 1988 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $707 $302 Not Implemented
RU0042 # 04 Y:1988 04 1988 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,960 $0 Implemented
RU0042 # 05 Y:1988 05 1988 COVER OPEN TANKS $2,347 $400 Not Implemented
RU0042 # 06 Y:1988 06 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,295 $1,510 Implemented
RU0042 # 07 Y:1988 07 1988 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $35,736 $44,360 Implemented