IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

26

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0154 # 09 Y:1998 09 1998 CLEAR AND RENT EXISTING SPACE $180,000 $4,000 Not Implemented
WV0154 # 08 Y:1998 08 1998 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $1,940 $550 Not Implemented
WV0154 # 07 Y:1998 07 1998 RECOVER AND REUSE COOLING WATER $670 $1,525 Not Implemented
WV0154 # 06 Y:1998 06 1998 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $142 $220 Not Implemented
WV0154 # 05 Y:1998 05 1998 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $162 $550 Not Implemented
WV0154 # 04 Y:1998 04 1998 INSTALL / REPAIR INSULATION ON STEAM LINES $322 $482 Not Implemented
WV0154 # 03 Y:1998 03 1998 INSULATE BARE EQUIPMENT $4,282 $5,130 Not Implemented
WV0154 # 02 Y:1998 02 1998 INSULATE BARE EQUIPMENT $16,667 $9,432 Not Implemented
WV0154 # 01 Y:1998 01 1998 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $1,075 $2,580 Not Implemented
OD0113 # 02 Y:1998 02 1998 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $15,720 $21,621 Implemented
OD0113 # 07 Y:1998 07 1998 OPTIMIZE PLANT POWER FACTOR $9,036 $50,000 Implemented
OD0113 # 06 Y:1998 06 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,794 $14,284 Implemented
OD0113 # 05 Y:1998 05 1998 REDUCE VENTILATION AIR $1,897 $0 Not Implemented
OD0113 # 04 Y:1998 04 1998 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $209 $250 Not Implemented
OD0113 # 03 Y:1998 03 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,820 $1,091 Implemented
OD0113 # 01 Y:1998 01 1998 ELIMINATE/REDUCE AN OPERATION $22,713 $0 Not Implemented
WV0138 # 04 Y:1998 04 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $186 $112 Not Implemented
WV0138 # 05 Y:1998 05 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $515 $240 Implemented
WV0138 # 06 Y:1998 06 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $900 $3,830 Implemented
WV0138 # 07 Y:1998 07 1998 INSULATE BARE EQUIPMENT $4,520 $380 Not Implemented
WV0138 # 08 Y:1998 08 1998 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $2,724 $0 Implemented
WV0138 # 09 Y:1998 09 1998 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $3,429 $0 Implemented
WV0138 # 10 Y:1998 10 1998 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $57,600 $272 Not Implemented
WV0138 # 03 Y:1998 03 1998 RECOVER WASTE HEAT FROM EQUIPMENT $865 $324 Not Implemented
WV0138 # 02 Y:1998 02 1998 USE SYNTHETIC LUBRICANT $343 $254 Implemented