IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

41

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0119 # 06 Y:2013 06 2013 USE SYNTHETIC LUBRICANT $5,466 $1,000 Not Implemented
DL0119 # 05 Y:2013 05 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,947 $3,000 Not Implemented
DL0119 # 04 Y:2013 04 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,382 $20,000 Not Implemented
DL0119 # 03 Y:2013 03 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $35,978 $95,000 Not Implemented
DL0119 # 02 Y:2013 02 2013 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $45,282 $138,000 Not Implemented
DL0119 # 01 Y:2013 01 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $74,490 $34,000 Not Implemented
DL0117 # 05 Y:2013 05 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $23,476 $5,870 Implemented
DL0117 # 01 Y:2013 01 2013 UPGRADE CONTROLS ON COMPRESSORS $3,345 $500 Not Implemented
DL0117 # 02 Y:2013 02 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $60,922 $5,695 Implemented
DL0117 # 03 Y:2013 03 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,400 $6,000 Not Implemented
DL0117 # 04 Y:2013 04 2013 RECOVER WASTE HEAT FROM EQUIPMENT $138,552 $277,104 Not Implemented
DL0114 # 02 Y:2013 02 2013 RECOVER WASTE HEAT FROM EQUIPMENT $12,684 $2,350 Not Implemented
DL0114 # 01 Y:2013 01 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,410 $2,000 Not Implemented
DL0114 # 08 Y:2013 08 2013 USE PHOTOCELL CONTROLS $100 $85 Not Implemented
DL0114 # 07 Y:2013 07 2013 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $10,394 $7,600 Not Implemented
DL0114 # 06 Y:2013 06 2013 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $27,486 $11,000 Not Implemented
DL0114 # 05 Y:2013 05 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,930 $2,000 Not Implemented
DL0114 # 04 Y:2013 04 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,080 $500 Not Implemented
DL0114 # 03 Y:2013 03 2013 RECOVER WASTE HEAT FROM EQUIPMENT $11,278 $2,350 Not Implemented
DL0114 # 09 Y:2013 09 2013 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $41,139 $70,800 Not Implemented
WV0462 # 03 Y:2013 03 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $75,533 $77,000 Not Implemented
WV0462 # 04 Y:2013 04 2013 UPGRADE CONTROLS ON COMPRESSORS $65,843 $50,000 Not Implemented
WV0462 # 05 Y:2013 05 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $57,184 $0 Implemented
WV0462 # 06 Y:2013 06 2013 REPAIR OR REPLACE STEAM TRAPS $42,971 $6,850 Implemented
WV0462 # 07 Y:2013 07 2013 INSTALL / REPAIR INSULATION ON STEAM LINES $25,992 $29,385 Implemented