IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

130

matching recommendations
Reset
SIC 36 Electronic & Other Electric Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ME0154 # 04 Y:1995 04 1995 $11,057 $30,000 Not Implemented
ME0154 # 05 Y:1995 05 1995 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,796 $980 Not Implemented
ME0154 # 06 Y:1995 06 1995 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,537 $1,175 Implemented
ME0154 # 07 Y:1995 07 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,118 $800 Not Implemented
ME0154 # 08 Y:1995 08 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,900 $400 Implemented
ME0154 # 09 Y:1995 09 1995 MINIMIZE WATER USAGE $2,815 $440 Implemented
ME0154 # 10 Y:1995 10 1995 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $300 $150 Not Implemented
ME0153 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,033 $32,229 Implemented
ME0153 # 02 Y:1995 02 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,450 $750 Implemented
ME0153 # 03 Y:1995 03 1995 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $1,432 $0 Not Implemented
ME0153 # 04 Y:1995 04 1995 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $899 $1,350 Implemented
ME0153 # 05 Y:1995 05 1995 INSTALL OCCUPANCY SENSORS $650 $300 Not Implemented
ME0153 # 06 Y:1995 06 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $580 $300 Implemented
ME0153 # 07 Y:1995 07 1995 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $22,220 $30,000 Not Implemented
ME0153 # 08 Y:1995 08 1995 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $13,800 $10,000 Implemented
ME0153 # 09 Y:1995 09 1995 CONTRACT A WOOD PALLET RECYCLING COMPANY $6,000 $0 Not Implemented
ME0153 # 10 Y:1995 10 1995 ELIMINATE LEAKS IN WATER LINES AND VALVES $926 $50 Implemented
ME0104 # 01 Y:1993 01 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $950 $200 Implemented
ME0104 # 02 Y:1993 02 1993 INSULATE BARE EQUIPMENT $1,217 $500 Implemented
ME0104 # 03 Y:1993 03 1993 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,808 $0 Implemented
ME0104 # 04 Y:1993 04 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,446 $200 Implemented
ME0104 # 05 Y:1993 05 1993 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,735 $50 Implemented
MA0145 # 01 Y:1989 01 1989 TURN OFF EQUIPMENT WHEN NOT IN USE $3,559 $0 Not Implemented
MA0145 # 02 Y:1989 02 1989 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,230 $4,500 Implemented
MA0145 # 03 Y:1989 03 1989 RECOVER WASTE HEAT FROM EQUIPMENT $2,036 $4,870 Not Implemented