IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

33

matching recommendations
Reset
SIC 36 Electronic & Other Electric Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ME0168 # 02 Y:1995 02 1995 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $12,532 $1,125 Implemented
ME0168 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $34,808 $109,189 Not Implemented
ME0168 # 13 Y:1995 13 1995 MINIMIZE WATER USAGE $1,618 $440 Implemented
ME0168 # 12 Y:1995 12 1995 MINIMIZE WATER USAGE $4,333 $1,300 Implemented
ME0168 # 11 Y:1995 11 1995 USE REVERSE OSMOSIS TO CONCENTRATE MATERIAL $4,998 $3,500 Not Implemented
ME0168 # 10 Y:1995 10 1995 CLOSE OFF UNNEEDED STEAM LINES $12,433 $0 Not Implemented
ME0168 # 09 Y:1995 09 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $411 $400 Not Implemented
ME0168 # 08 Y:1995 08 1995 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $550 $0 Implemented
ME0168 # 07 Y:1995 07 1995 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,630 $1,800 Not Implemented
ME0168 # 06 Y:1995 06 1995 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $3,000 $500 Not Implemented
ME0168 # 05 Y:1995 05 1995 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $4,610 $5,000 Implemented
ME0168 # 04 Y:1995 04 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,019 $600 Implemented
ME0168 # 03 Y:1995 03 1995 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,640 $1,417 Implemented
ME0154 # 03 Y:1995 03 1995 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $5,200 $400 Not Implemented
ME0154 # 02 Y:1995 02 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,527 $1,500 Not Implemented
ME0154 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,883 $50,267 Not Implemented
ME0154 # 04 Y:1995 04 1995 $11,057 $30,000 Not Implemented
ME0154 # 05 Y:1995 05 1995 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,796 $980 Not Implemented
ME0154 # 09 Y:1995 09 1995 MINIMIZE WATER USAGE $2,815 $440 Implemented
ME0154 # 10 Y:1995 10 1995 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $300 $150 Not Implemented
ME0154 # 06 Y:1995 06 1995 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,537 $1,175 Implemented
ME0154 # 07 Y:1995 07 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,118 $800 Not Implemented
ME0154 # 08 Y:1995 08 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,900 $400 Implemented
ME0153 # 07 Y:1995 07 1995 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $22,220 $30,000 Not Implemented
ME0153 # 06 Y:1995 06 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $580 $300 Implemented