IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

367

matching recommendations
Reset
NAICS 332 Fabricated Metal Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0440 # 01 Y:2014 01 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,365 $500 Implemented
UD0891 # 01 Y:2013 01 2013 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $112,427 $100,000 Not Implemented
UD0891 # 02 Y:2013 02 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,664 $3,000 Implemented
UD0891 # 03 Y:2013 03 2013 RECOVER WASTE HEAT FROM EQUIPMENT $8,643 $30,000 Not Implemented
UD0891 # 04 Y:2013 04 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $868 $1,000 Implemented
UD0891 # 05 Y:2013 05 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,992 $27,380 Not Implemented
UD0891 # 06 Y:2013 06 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $641 $300 Not Implemented
UM0428 # 01 Y:2013 01 2013 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT $74,405 $210,000 Not Implemented
UM0428 # 02 Y:2013 02 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,106 $1,500 Implemented
UM0428 # 03 Y:2013 03 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $990 $100 Implemented
UM0428 # 04 Y:2013 04 2013 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $636 $1,200 Implemented
UM0428 # 05 Y:2013 05 2013 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,177 $9,000 Implemented
UM0428 # 06 Y:2013 06 2013 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $1,332 $500 Not Implemented
UM0422 # 03 Y:2013 03 2013 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $29,593 $14,120 Implemented
UM0422 # 02 Y:2013 02 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,633 $500 Implemented
UM0422 # 01 Y:2013 01 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $31,550 $15,331 Not Implemented
UM0419 # 01 Y:2013 01 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,593 $200 Not Implemented
UM0419 # 03 Y:2013 03 2013 USE FLUE GASES IN RADIANT HEATER FOR SPACE HEATING, OVENS, ETC $9,991 $0 Not Implemented
UM0419 # 02 Y:2013 02 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,967 $4,350 Not Implemented
UM0415 # 06 Y:2012 06 2012 INSULATE BARE EQUIPMENT $1,697 $1,500 Not Implemented
UM0415 # 05 Y:2012 05 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $23,600 $1,000 Implemented
UM0415 # 04 Y:2012 04 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,832 $10,965 Not Implemented
UM0415 # 03 Y:2012 03 2012 OPTIMIZE PLANT POWER FACTOR $12,081 $20,000 Not Implemented
UM0415 # 02 Y:2012 02 2012 INSTALL OCCUPANCY SENSORS $822 $875 Implemented
UM0415 # 01 Y:2012 01 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $8,072 $4,000 Not Implemented