IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

90

matching recommendations
Reset
NAICS 3329 Other Fabricated Metal Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0367 # 14 Y:2010 14 2010 INSTALL STORM WINDOWS AND DOORS $171 $1,400 Implemented
UM0367 # 13 Y:2010 13 2010 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $277 $329 Implemented
UM0367 # 12 Y:2010 12 2010 INSULATE BARE EQUIPMENT $573 $3,568 Not Implemented
UM0367 # 11 Y:2010 11 2010 PREHEAT COMBUSTION AIR WITH WASTE HEAT $3,186 $7,500 Implemented
UM0367 # 10 Y:2010 10 2010 USE RADIANT HEATER FOR SPOT HEATING $4,999 $8,600 Not Implemented
UM0367 # 09 Y:2010 09 2010 RECOVER WASTE HEAT FROM EQUIPMENT $10,537 $10,500 Not Implemented
UM0367 # 08 Y:2010 08 2010 RECOVER WASTE HEAT FROM EQUIPMENT $12,939 $500 Implemented
UM0367 # 07 Y:2010 07 2010 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $17,317 $9,800 Implemented
UM0367 # 05 Y:2010 05 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,497 $200 Not Implemented
UM0367 # 06 Y:2010 06 2010 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $27,997 $68,395 Implemented
UM0367 # 02 Y:2010 02 2010 COVER OPEN TANKS $4,570 $285 Not Implemented
UM0367 # 03 Y:2010 03 2010 INSTALL OCCUPANCY SENSORS $2,249 $1,158 Not Implemented
UM0367 # 04 Y:2010 04 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,913 $2,000 Implemented
IC0147 # 01 Y:2008 01 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,453 $75,348 Implemented
IC0147 # 02 Y:2008 02 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $35,889 $55,200 Implemented
IC0147 # 03 Y:2008 03 2008 INSTALL OCCUPANCY SENSORS $1,712 $2,967 Implemented
IC0147 # 04 Y:2008 04 2008 DISCONNECT BALLASTS $4,311 $4,750 Implemented
IC0147 # 05 Y:2008 05 2008 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $395 $250 Implemented
IC0147 # 06 Y:2008 06 2008 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $24,605 $0 Implemented
IC0147 # 07 Y:2008 07 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $133 $398 Implemented
IC0147 # 08 Y:2008 08 2008 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,952 $15,562 Implemented
IC0147 # 09 Y:2008 09 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $200 $246 Implemented
IC0147 # 10 Y:2008 10 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,527 $30,225 Implemented
IC0147 # 11 Y:2008 11 2008 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $6,598 $9,911 Implemented
IC0147 # 13 Y:2008 13 2008 UPGRADE OBSOLETE EQUIPMENT $17,075 $5,520 Implemented