IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

168

matching recommendations
Reset
SIC 37 Transportation Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0345 # 02 Y:2008 02 2008 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $8,397 $1,650 Implemented
UM0337 # 06 Y:2008 06 2008 INSULATE BARE EQUIPMENT $791 $478 Implemented
UM0337 # 02 Y:2008 02 2008 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $8,515 $240 Implemented
UM0335 # 07 Y:2008 07 2008 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $1,972 $50 Implemented
UM0335 # 06 Y:2008 06 2008 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $5,331 $15,000 Implemented
UM0335 # 05 Y:2008 05 2008 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $7,221 $500 Implemented
UM0327 # 01 Y:2007 01 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $24,123 $9,375 Implemented
UM0327 # 08 Y:2007 08 2007 COVER OPEN TANKS $561 $275 Implemented
UM0327 # 05 Y:2007 05 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,516 $1,000 Implemented
UM0320 # 02 Y:2007 02 2007 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $19,072 $0 Implemented
UM0320 # 04 Y:2007 04 2007 REVISE SMOKE CLEANUP FROM OPERATIONS $11,829 $1,846 Implemented
UM0320 # 05 Y:2007 05 2007 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $10,797 $0 Implemented
UM0320 # 06 Y:2007 06 2007 OPTIMIZE PLANT POWER FACTOR $10,572 $19,721 Implemented
UM0320 # 07 Y:2007 07 2007 RECOVER WASTE HEAT FROM EQUIPMENT $7,938 $500 Implemented
UM0320 # 08 Y:2007 08 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,982 $825 Implemented
UM0320 # 09 Y:2007 09 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,603 $20 Implemented
UM0320 # 10 Y:2007 10 2007 UPGRADE CONTROLS ON COMPRESSORS $4,703 $1 Implemented
UM0320 # 11 Y:2007 11 2007 DISCONNECT BALLASTS $3,782 $0 Implemented
UM0320 # 12 Y:2007 12 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,510 $80 Implemented
UM0320 # 13 Y:2007 13 2007 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $900 $100 Implemented
UM0316 # 05 Y:2007 05 2007 INSTALL OCCUPANCY SENSORS $686 $350 Implemented
UM0316 # 04 Y:2007 04 2007 INSULATE BARE EQUIPMENT $1,059 $833 Implemented
UM0297 # 03 Y:2006 03 2006 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $6,156 $3,450 Implemented
UM0297 # 05 Y:2006 05 2006 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $5,020 $872 Implemented
UM0297 # 06 Y:2006 06 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,215 $6,601 Implemented