IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

18

matching recommendations
Reset
SIC 38 Instruments And Related Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0434 # 06 Y:2013 06 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,318 $2,500 Implemented
UM0434 # 03 Y:2013 03 2013 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $7,121 $16,500 Implemented
UM0434 # 02 Y:2013 02 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,543 $17,630 Implemented
UM0432 # 04 Y:2013 04 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,790 $2,500 Implemented
UM0432 # 03 Y:2013 03 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,532 $200 Implemented
UM0432 # 01 Y:2013 01 2013 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $10,000 $10,000 Implemented
UM0219 # 02 Y:2002 02 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,965 $62,826 Implemented
UM0219 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $283 $225 Implemented
UM0219 # 05 Y:2002 05 2002 TURN OFF EQUIPMENT WHEN NOT IN USE $1,258 $800 Implemented
UM0219 # 06 Y:2002 06 2002 REPLACE BOILER $3,920 $12,000 Implemented
UM0219 # 07 Y:2002 07 2002 RECOVER AND REUSE COOLING WATER $8,640 $5,940 Implemented
UM0118 # 02 Y:1998 02 1998 INSTALL OCCUPANCY SENSORS $523 $900 Implemented
UM0118 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,082 $10,080 Implemented
ND0041 # 07 Y:1992 07 1992 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $273 $450 Implemented
ND0041 # 06 Y:1992 06 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $204 $692 Implemented
ND0041 # 04 Y:1992 04 1992 INSTALL STORM WINDOWS AND DOORS $996 $750 Implemented
ND0041 # 03 Y:1992 03 1992 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,344 $1,200 Implemented
ND0041 # 01 Y:1992 01 1992 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $2,695 $4,000 Implemented