Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,974
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MU0043 # 09 Y:2023 | 09 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $18,979 | $158,490 | n/a |
MU0043 # 08 Y:2023 | 08 | 2023 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $39,395 | $128,601 | n/a |
MU0043 # 07 Y:2023 | 07 | 2023 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $54 | $51 | n/a |
MU0043 # 04 Y:2023 | 04 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $228 | $480 | n/a |
MU0043 # 06 Y:2023 | 06 | 2023 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $20,803 | $28,063 | n/a |
MU0041 # 11 Y:2023 | 11 | 2023 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $2,870 | $5,510 | n/a |
MU0041 # 01 Y:2023 | 01 | 2023 | INSTALL AUTOMATIC STACK DAMPER | $4,161 | $959 | n/a |
MU0041 # 08 Y:2023 | 08 | 2023 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $3,605 | $0 | n/a |
MU0041 # 05 Y:2023 | 05 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $673 | $240 | n/a |
MU0041 # 07 Y:2023 | 07 | 2023 | INSTALL SET-BACK TIMERS | $86,283 | $371,500 | n/a |
MU0041 # 02 Y:2023 | 02 | 2023 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $1,074 | $844 | n/a |
MU0041 # 04 Y:2023 | 04 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,396 | $6,403 | n/a |
MU0041 # 03 Y:2023 | 03 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $26,806 | $25,843 | n/a |
MU0041 # 09 Y:2023 | 09 | 2023 | INSTALL OCCUPANCY SENSORS | $270 | $189 | n/a |
MU0041 # 06 Y:2023 | 06 | 2023 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $20,235 | $100,548 | n/a |
MU0041 # 12 Y:2023 | 12 | 2023 | UTILIZE SENSORS CONTROLLING ROOF AND WALL OPENINGS | $4,105 | $5,076 | n/a |
MU0041 # 10 Y:2023 | 10 | 2023 | USE RADIANT HEATER FOR SPOT HEATING | $4,201 | $33,470 | n/a |
MUCM16 # 02 Y:2023 | 02 | 2023 | USE PHOTOCELL CONTROLS | $28 | $96 | n/a |
MUCM16 # 07 Y:2023 | 07 | 2023 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $184 | $1,268 | n/a |
MUCM16 # 05 Y:2023 | 05 | 2023 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $512 | $1,289 | n/a |
MUCM16 # 01 Y:2023 | 01 | 2023 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $915 | $5,855 | n/a |
MUCM16 # 06 Y:2023 | 06 | 2023 | USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES | $20 | $122 | n/a |
MUCM16 # 03 Y:2023 | 03 | 2023 | INSTALL OCCUPANCY SENSORS | $492 | $821 | n/a |
MUCM16 # 04 Y:2023 | 04 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $871 | $293 | n/a |
MUCM15 # 04 Y:2023 | 04 | 2023 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $106 | $50 | n/a |