Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
49
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0451 # 01 Y:2014 | 01 | 2014 | OPTIMIZE PLANT POWER FACTOR | $16,165 | $25,000 | Implemented |
UM0451 # 04 Y:2014 | 04 | 2014 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $3,930 | $6,000 | Not Implemented |
UM0451 # 03 Y:2014 | 03 | 2014 | REVISE SMOKE CLEANUP FROM OPERATIONS | $79,670 | $60,000 | Not Implemented |
UM0451 # 02 Y:2014 | 02 | 2014 | INSTALL OCCUPANCY SENSORS | $6,320 | $4,800 | Implemented |
UM0450 # 04 Y:2014 | 04 | 2014 | REVISE SMOKE CLEANUP FROM OPERATIONS | $14,049 | $6,000 | Not Implemented |
UM0450 # 03 Y:2014 | 03 | 2014 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $23,065 | $22,600 | Not Implemented |
UM0450 # 02 Y:2014 | 02 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $23,421 | $26,000 | Not Implemented |
UM0450 # 01 Y:2014 | 01 | 2014 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $58,763 | $200,000 | Not Implemented |
UM0448 # 01 Y:2014 | 01 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $49,995 | $61,425 | Not Implemented |
UM0448 # 02 Y:2014 | 02 | 2014 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $11,310 | $500 | Implemented |
UM0448 # 03 Y:2014 | 03 | 2014 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,336 | $2,500 | Implemented |
UM0448 # 04 Y:2014 | 04 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,564 | $500 | Not Implemented |
UM0448 # 05 Y:2014 | 05 | 2014 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $7,545 | $4,750 | Not Implemented |
UM0447 # 02 Y:2014 | 02 | 2014 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $27,617 | $28,500 | Not Implemented |
UM0447 # 05 Y:2014 | 05 | 2014 | REPLACE BOILER | $33,249 | $3,000 | Not Implemented |
UM0447 # 04 Y:2014 | 04 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,906 | $1,000 | Implemented |
UM0447 # 01 Y:2014 | 01 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $32,946 | $5,000 | Implemented |
UM0447 # 03 Y:2014 | 03 | 2014 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $7,058 | $2,500 | Implemented |
UM0446 # 01 Y:2014 | 01 | 2014 | BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT | $166,000 | $500,000 | Not Implemented |
UM0446 # 04 Y:2014 | 04 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $28,000 | $50,000 | Not Implemented |
UM0446 # 06 Y:2014 | 06 | 2014 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $11,000 | $4,000 | Not Implemented |
UM0446 # 02 Y:2014 | 02 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,060 | $9,750 | Not Implemented |
UM0446 # 03 Y:2014 | 03 | 2014 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,150 | $2,500 | Not Implemented |
UM0446 # 05 Y:2014 | 05 | 2014 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $26,800 | $40,000 | Not Implemented |
UM0445 # 03 Y:2014 | 03 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $515 | $2,300 | Not Implemented |