Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
49
matching recommendationsSIC | 30 | Rubber And Miscellaneous Plastics Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KU0231 # 09 Y:1987 | 09 | 1987 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $-79 | $0 | Implemented |
KU0231 # 08 Y:1987 | 08 | 1987 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $132 | $250 | Not Implemented |
KU0231 # 07 Y:1987 | 07 | 1987 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $211 | $0 | Implemented |
KU0231 # 06 Y:1987 | 06 | 1987 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $212 | $120 | Implemented |
KU0231 # 05 Y:1987 | 05 | 1987 | IMPROVE LUBRICATION PRACTICES | $424 | $600 | Implemented |
KU0231 # 04 Y:1987 | 04 | 1987 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $445 | $600 | Not Implemented |
KU0231 # 01 Y:1987 | 01 | 1987 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,553 | $2,059 | Not Implemented |
KU0231 # 02 Y:1987 | 02 | 1987 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $847 | $100 | Implemented |
KU0231 # 03 Y:1987 | 03 | 1987 | INSTALL TIMERS AND/OR THERMOSTATS | $809 | $40 | Implemented |
KU0228 # 05 Y:1987 | 05 | 1987 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $1,064 | $0 | Implemented |
KU0228 # 09 Y:1987 | 09 | 1987 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $153 | $0 | Implemented |
KU0228 # 04 Y:1987 | 04 | 1987 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,401 | $700 | Implemented |
KU0228 # 03 Y:1987 | 03 | 1987 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $7,841 | $0 | Implemented |
KU0228 # 02 Y:1987 | 02 | 1987 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,815 | $14,465 | Implemented |
KU0228 # 01 Y:1987 | 01 | 1987 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $16,760 | $0 | Not Implemented |
KU0228 # 06 Y:1987 | 06 | 1987 | INSTALL AUTOMATIC STACK DAMPER | $1,550 | $700 | Not Implemented |
KU0228 # 07 Y:1987 | 07 | 1987 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $919 | $1,700 | Implemented |
KU0228 # 08 Y:1987 | 08 | 1987 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $873 | $50 | Not Implemented |
KU0225 # 11 Y:1987 | 11 | 1987 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,035 | $0 | Implemented |
KU0225 # 09 Y:1987 | 09 | 1987 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $388 | $400 | Not Implemented |
KU0225 # 08 Y:1987 | 08 | 1987 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,280 | $800 | Not Implemented |
KU0225 # 06 Y:1987 | 06 | 1987 | INSTALL AUTOMATIC STACK DAMPER | $1,432 | $300 | Not Implemented |
KU0225 # 05 Y:1987 | 05 | 1987 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $942 | $0 | Implemented |
KU0223 # 08 Y:1987 | 08 | 1987 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $380 | $0 | Implemented |
KU0225 # 03 Y:1987 | 03 | 1987 | INSULATE BARE EQUIPMENT | $13,017 | $8,000 | Implemented |