IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

321

matching recommendations
Reset
SIC 35 Industrial Machinery And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0208 # 04 Y:2016 04 2016 REPLACE GASOLINE WITH DIESEL, LPG, OR NATURAL GAS $118,110 $525,000 Implemented
MZ0205 # 05 Y:2015 05 2015 INSTALL OCCUPANCY SENSORS $969 $400 Implemented
MZ0205 # 02 Y:2015 02 2015 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $1,559 $0 Implemented
MZ0205 # 03 Y:2015 03 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,581 $850 Implemented
MZ0205 # 04 Y:2015 04 2015 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $397 $0 Implemented
MZ0206 # 04 Y:2015 04 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $376 $0 Implemented
MZ0206 # 03 Y:2015 03 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,082 $2,600 Implemented
MZ0206 # 02 Y:2015 02 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,931 $890 Implemented
MZ0207 # 05 Y:2015 05 2015 ELIMINATE/REDUCE AN OPERATION $149 $0 Implemented
MZ0207 # 03 Y:2015 03 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,538 $880 Implemented
MZ0207 # 02 Y:2015 02 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,482 $3,430 Implemented
MZ0207 # 01 Y:2015 01 2015 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $8,485 $27,300 Implemented
MZ0191 # 08 Y:2015 08 2015 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $10,458 $0 Implemented
MZ0191 # 02 Y:2015 02 2015 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $16,902 $0 Implemented
MZ0142 # 05 Y:2014 05 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,435 $31,000 Implemented
MZ0113 # 01 Y:2013 01 2013 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $17,414 $8,758 Implemented
MZ0113 # 03 Y:2013 03 2013 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $7,609 $1,000 Implemented
MZ0113 # 04 Y:2013 04 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,882 $1,698 Implemented
MZ0113 # 05 Y:2013 05 2013 INSTALL SPECTRAL REFLECTORS / DELAMP $3,613 $4,973 Implemented
MZ0113 # 06 Y:2013 06 2013 UPGRADE CONTROLS ON COMPRESSORS $3,575 $3,500 Implemented
MZ0113 # 07 Y:2013 07 2013 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $1,948 $50 Implemented
MZ0113 # 11 Y:2013 11 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $488 $1,050 Implemented
MZ0113 # 10 Y:2013 10 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $494 $620 Implemented
MZ0113 # 09 Y:2013 09 2013 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $545 $902 Implemented
MZ0113 # 08 Y:2013 08 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,620 $900 Implemented