IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

57

matching recommendations
Reset
SIC 36 Electronic & Other Electric Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MO0105 # 02 Y:1993 02 1993 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $5,635 $100 Implemented
MO0105 # 04 Y:1993 04 1993 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $43,359 $7,325 Not Implemented
MO0105 # 10 Y:1993 10 1993 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $334 $20 Implemented
MO0105 # 09 Y:1993 09 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $907 $554 Implemented
MO0105 # 08 Y:1993 08 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,346 $777 Implemented
MO0105 # 07 Y:1993 07 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,548 $1,125 Implemented
MO0105 # 06 Y:1993 06 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $9,317 $31,982 Implemented
MO0105 # 05 Y:1993 05 1993 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $515 $1,024 Implemented
MO0105 # 01 Y:1993 01 1993 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $67,868 $8,774 Not Implemented
MO0105 # 03 Y:1993 03 1993 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $204 $0 Implemented
MO0102 # 03 Y:1993 03 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $75 $20 Implemented
MO0102 # 01 Y:1993 01 1993 INSULATE BARE EQUIPMENT $1,408 $1,243 Not Implemented
MO0102 # 05 Y:1993 05 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $378 $490 Not Implemented
MO0102 # 06 Y:1993 06 1993 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $29,208 $43,264 Not Implemented
MO0102 # 04 Y:1993 04 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,376 $9,298 Not Implemented
MO0102 # 02 Y:1993 02 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,000 $13,675 Implemented
MO0101 # 01 Y:1993 01 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,770 $2,921 Implemented
MO0101 # 02 Y:1993 02 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,085 $33,727 Implemented
MO0101 # 03 Y:1993 03 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $12,241 $25,679 Implemented
MO0101 # 04 Y:1993 04 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,385 $840 Not Implemented
MO0101 # 05 Y:1993 05 1993 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $341 $179 Not Implemented
MO0101 # 06 Y:1993 06 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,364 $1,397 Not Implemented
MO0101 # 07 Y:1993 07 1993 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $203 $25 Not Implemented
MO0096 # 07 Y:1993 07 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $527 $92 Implemented
MO0096 # 08 Y:1993 08 1993 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $47,000 $15,247 Not Implemented