IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

184

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0336 # 02 Y:1991 02 1991 USE DIRECT AIR SUPPLY TO EXHAUST HOODS $15,055 $18,000 Implemented
KU0336 # 03 Y:1991 03 1991 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $12,114 $27,600 Implemented
KU0336 # 04 Y:1991 04 1991 RECOVER WASTE HEAT FROM EQUIPMENT $9,818 $3,800 Implemented
KU0336 # 05 Y:1991 05 1991 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $22,099 $22,000 Implemented
KU0336 # 06 Y:1991 06 1991 REDESIGN PROCESS $10,585 $25,200 Implemented
KU0336 # 07 Y:1991 07 1991 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $5,650 $17,100 Implemented
KU0336 # 08 Y:1991 08 1991 DE-ENERGIZE EXCESS TRANSFORMER CAPACITY $1,112 $0 Implemented
KU0336 # 09 Y:1991 09 1991 INSTALL SET-BACK TIMERS $899 $1,000 Implemented
KU0336 # 10 Y:1991 10 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $366 $0 Implemented
KU0336 # 11 Y:1991 11 1991 RECOVER AND REUSE COOLING WATER $9,720 $5,340 Implemented
MO0021 # 01 Y:1991 01 1991 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $7,969 $1,195 Implemented
MO0021 # 02 Y:1991 02 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,790 $1,316 Implemented
MO0021 # 03 Y:1991 03 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,061 $5,968 Implemented
MO0021 # 04 Y:1991 04 1991 INSULATE BARE EQUIPMENT $3,394 $6,952 Implemented
MO0021 # 05 Y:1991 05 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $961 $0 Implemented
MO0021 # 06 Y:1991 06 1991 INSULATE BARE EQUIPMENT $1,577 $4,250 Implemented
MO0021 # 07 Y:1991 07 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,114 $435 Implemented
MO0021 # 08 Y:1991 08 1991 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $289 $700 Implemented
MO0022 # 01 Y:1991 01 1991 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,566 $2,267 Implemented
MO0022 # 02 Y:1991 02 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,956 $6,256 Implemented
MO0022 # 03 Y:1991 03 1991 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,150 $60 Implemented
MO0022 # 04 Y:1991 04 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $469 $200 Implemented
MO0022 # 05 Y:1991 05 1991 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $45 $334 Implemented
MO0022 # 06 Y:1991 06 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $262 $0 Implemented
KU0334 # 01 Y:1991 01 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $10,153 $1,800 Implemented