IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

118

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0237 # 01 Y:2017 01 2017 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,793 $0 Implemented
MZ0237 # 04 Y:2017 04 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $599 $50 Implemented
MZ0237 # 05 Y:2017 05 2017 RECOVER WASTE HEAT FROM EQUIPMENT $36,123 $11,000 Implemented
MZ0237 # 06 Y:2017 06 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,362 $25,000 Implemented
MZ0237 # 07 Y:2017 07 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $69 $0 Implemented
MZ0237 # 08 Y:2017 08 2017 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $22,338 $0 Implemented
MZ0231 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,949 $28,500 Implemented
MZ0231 # 02 Y:2017 02 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,265 $12,363 Implemented
MZ0231 # 03 Y:2017 03 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,125 $30 Implemented
MZ0231 # 04 Y:2017 04 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $713 $250 Implemented
MZ0231 # 06 Y:2017 06 2017 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,438 $11,250 Implemented
MZ0231 # 07 Y:2017 07 2017 INSULATE BARE EQUIPMENT $20,503 $34,150 Implemented
MZ0231 # 08 Y:2017 08 2017 INSULATE BARE EQUIPMENT $3,785 $21,000 Implemented
MZ0230 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,978 $27,450 Implemented
MZ0230 # 02 Y:2017 02 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,308 $0 Implemented
MZ0230 # 03 Y:2017 03 2017 MINIMIZE WATER USAGE $199 $30 Implemented
MZ0230 # 05 Y:2017 05 2017 INSULATE BARE EQUIPMENT $3,927 $1,050 Implemented
MZ0234 # 01 Y:2017 01 2017 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $407 $2,000 Implemented
MZ0234 # 02 Y:2017 02 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,800 $0 Implemented
MZ0234 # 03 Y:2017 03 2017 INSTALL OCCUPANCY SENSORS $1,354 $1,550 Implemented
MZ0234 # 06 Y:2017 06 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,361 $50 Implemented
MZ0228 # 01 Y:2017 01 2017 ELIMINATE LEAKS IN WATER LINES AND VALVES $20,062 $0 Implemented
MZ0228 # 02 Y:2017 02 2017 RECOVER WASTE HEAT FROM EQUIPMENT $7,002 $1,080 Implemented
MZ0228 # 03 Y:2017 03 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,092 $1,772 Implemented
MZ0228 # 04 Y:2017 04 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,423 $280 Implemented