Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
200
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KU0206 # 09 Y:1986 | 09 | 1986 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $979 | $0 | Not Implemented |
KU0206 # 10 Y:1986 | 10 | 1986 | ADD AIR SHIELDS TO TRUCKS TO INCREASE FUEL MILEAGE | $239 | $0 | Implemented |
KU0209 # 10 Y:1986 | 10 | 1986 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,842 | $8,000 | Not Implemented |
KU0206 # 04 Y:1986 | 04 | 1986 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $2,243 | $0 | Not Implemented |
KU0206 # 12 Y:1986 | 12 | 1986 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $115 | $0 | Implemented |
KU0209 # 01 Y:1986 | 01 | 1986 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $37,717 | $30,000 | Not Implemented |
KU0206 # 01 Y:1986 | 01 | 1986 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,289 | $5,696 | Implemented |
KU0206 # 05 Y:1986 | 05 | 1986 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $2,155 | $4,000 | Not Implemented |
KU0209 # 07 Y:1986 | 07 | 1986 | INSTALL TIMERS AND/OR THERMOSTATS | $3,611 | $945 | Implemented |
KU0209 # 04 Y:1986 | 04 | 1986 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $25,756 | $5,000 | Not Implemented |
KU0209 # 06 Y:1986 | 06 | 1986 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $9,092 | $0 | Not Implemented |
KU0209 # 02 Y:1986 | 02 | 1986 | IMPROVE LUBRICATION PRACTICES | $23,084 | $20,000 | Not Implemented |
KU0206 # 03 Y:1986 | 03 | 1986 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $2,935 | $1,500 | Implemented |
KU0209 # 05 Y:1986 | 05 | 1986 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $11,981 | $20,000 | Implemented |
KU0209 # 12 Y:1986 | 12 | 1986 | SHUT OFF PILOTS IN STANDBY EQUIPMENT | $809 | $0 | Implemented |
KU0206 # 02 Y:1986 | 02 | 1986 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $4,313 | $107 | Implemented |
KU0209 # 18 Y:1986 | 18 | 1986 | MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT | $135 | $0 | Implemented |
KU0206 # 11 Y:1986 | 11 | 1986 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $183 | $100 | Implemented |
KU0209 # 13 Y:1986 | 13 | 1986 | KEEP BOILER TUBES CLEAN | $796 | $1,600 | Implemented |
KU0209 # 03 Y:1986 | 03 | 1986 | INSTALL AUTOMATIC STACK DAMPER | $19,573 | $13,500 | Not Implemented |
KU0206 # 07 Y:1986 | 07 | 1986 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $641 | $0 | Not Implemented |
KU0209 # 08 Y:1986 | 08 | 1986 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,187 | $5,000 | Implemented |
KU0209 # 09 Y:1986 | 09 | 1986 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,209 | $3,372 | Implemented |
KU0206 # 08 Y:1986 | 08 | 1986 | SHUT OFF PILOTS IN STANDBY EQUIPMENT | $474 | $0 | Implemented |
KU0206 # 06 Y:1986 | 06 | 1986 | IMPROVE LUBRICATION PRACTICES | $1,718 | $1,515 | Not Implemented |