IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

104

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0299 # 01 Y:1989 01 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $421 $121 Implemented
KU0299 # 04 Y:1989 04 1989 REPAIR OR REPLACE STEAM TRAPS $8,388 $450 Implemented
KU0299 # 08 Y:1989 08 1989 INSULATE BARE EQUIPMENT $183 $280 Not Implemented
KU0299 # 02 Y:1989 02 1989 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $447 $250 Implemented
KU0299 # 05 Y:1989 05 1989 RECOVER WASTE HEAT FROM EQUIPMENT $3,205 $2,400 Not Implemented
KU0299 # 07 Y:1989 07 1989 SHUT OFF PILOTS IN STANDBY EQUIPMENT $258 $0 Implemented
KU0299 # 03 Y:1989 03 1989 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $315 $150 Not Implemented
KU0299 # 06 Y:1989 06 1989 INSTALL AUTOMATIC STACK DAMPER $1,466 $1,700 Not Implemented
KU0295 # 08 Y:1989 08 1989 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,182 $500 Implemented
KU0295 # 03 Y:1989 03 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,741 $5,300 Implemented
KU0295 # 05 Y:1989 05 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,066 $0 Implemented
KU0295 # 01 Y:1989 01 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $390 $576 Implemented
KU0295 # 07 Y:1989 07 1989 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $120 $200 Not Implemented
KU0295 # 04 Y:1989 04 1989 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $1,301 $150 Implemented
KU0295 # 02 Y:1989 02 1989 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,793 $3,300 Implemented
KU0295 # 06 Y:1989 06 1989 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $238 $200 Not Implemented
KU0294 # 03 Y:1989 03 1989 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $7,667 $8,200 Not Implemented
KU0294 # 06 Y:1989 06 1989 RECOVER WASTE HEAT FROM EQUIPMENT $526 $200 Implemented
KU0294 # 05 Y:1989 05 1989 INSULATE BARE EQUIPMENT $1,104 $600 Implemented
KU0294 # 04 Y:1989 04 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,153 $4,100 Implemented
KU0294 # 01 Y:1989 01 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $903 $472 Implemented
KU0294 # 02 Y:1989 02 1989 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $16,418 $15,000 Not Implemented
KU0294 # 07 Y:1989 07 1989 TURN OFF EQUIPMENT WHEN NOT IN USE $579 $0 Implemented
KU0287 # 02 Y:1989 02 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,271 $400 Implemented
KU0287 # 01 Y:1989 01 1989 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $6,331 $4,000 Not Implemented