Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
124
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0302 # 03 Y:2020 | 03 | 2020 | INSULATE BARE EQUIPMENT | $251 | $226 | Not Implemented |
MZ0302 # 02 Y:2020 | 02 | 2020 | RECOVER WASTE HEAT FROM EQUIPMENT | $19,767 | $14,500 | Not Implemented |
MZ0302 # 04 Y:2020 | 04 | 2020 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $217 | $45 | Implemented |
MZ0302 # 05 Y:2020 | 05 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $32,817 | $55,992 | Implemented |
MZ0302 # 01 Y:2020 | 01 | 2020 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,015 | $4,700 | Implemented |
MZ0302 # 06 Y:2020 | 06 | 2020 | INSTALL OCCUPANCY SENSORS | $2,138 | $1,800 | Not Implemented |
MZ0301 # 07 Y:2020 | 07 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $604 | $200 | Implemented |
MZ0301 # 08 Y:2020 | 08 | 2020 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $304 | $52 | Implemented |
MZ0301 # 09 Y:2020 | 09 | 2020 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $673 | $405 | Implemented |
MZ0301 # 02 Y:2020 | 02 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,114 | $4,500 | Implemented |
MZ0301 # 06 Y:2020 | 06 | 2020 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,087 | $5,000 | Implemented |
MZ0301 # 04 Y:2020 | 04 | 2020 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,146 | $7,360 | Not Implemented |
MZ0301 # 05 Y:2020 | 05 | 2020 | USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER | $2,963 | $4,300 | Not Implemented |
MZ0301 # 03 Y:2020 | 03 | 2020 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,820 | $7,000 | Implemented |
MZ0301 # 01 Y:2020 | 01 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,251 | $400 | Not Implemented |
MZ0301 # 10 Y:2020 | 10 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,307 | $4,100 | Implemented |
MZ0301 # 11 Y:2020 | 11 | 2020 | INSTALL OCCUPANCY SENSORS | $1,132 | $1,720 | Not Implemented |
NL0053 # 05 Y:2020 | 05 | 2020 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $6,360 | $56 | Implemented |
NL0053 # 03 Y:2020 | 03 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,267 | $4,456 | Implemented |
NL0053 # 07 Y:2020 | 07 | 2020 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,612 | $1,245 | Not Implemented |
NL0053 # 06 Y:2020 | 06 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,013 | $1,500 | Implemented |
NL0053 # 02 Y:2020 | 02 | 2020 | KEEP EQUIPMENT CLEAN | $24,724 | $8,528 | Implemented |
NL0053 # 08 Y:2020 | 08 | 2020 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,080 | $56 | Implemented |
NL0053 # 01 Y:2020 | 01 | 2020 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $46,240 | $187,000 | Not Implemented |
NL0053 # 10 Y:2020 | 10 | 2020 | RECOVER AND REUSE WASTE MATERIAL | $637 | $630 | Not Implemented |