Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
121
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0356 # 06 Y:2023 | 06 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $525,252 | $3,450,533 | Not Implemented |
MZ0356 # 04 Y:2023 | 04 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,117 | $14,802 | Implemented |
MZ0356 # 02 Y:2023 | 02 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $10,731 | $440 | Not Implemented |
MZ0356 # 07 Y:2023 | 07 | 2023 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $135,000 | $306,035 | Not Implemented |
MZ0356 # 01 Y:2023 | 01 | 2023 | INSTALL OCCUPANCY SENSORS | $519 | $415 | Implemented |
MZ0356 # 03 Y:2023 | 03 | 2023 | RECOVER WASTE HEAT FROM EQUIPMENT | $29,176 | $63,400 | Not Implemented |
MZ0356 # 09 Y:2023 | 09 | 2023 | REPLACE TREATED WATER WITH WELL / SURFACE WATER | $10,677 | $100,000 | Not Implemented |
MZ0356 # 05 Y:2023 | 05 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $6,120 | $2,680 | Implemented |
MZ0356 # 08 Y:2023 | 08 | 2023 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $7,202 | $7,540 | Not Implemented |
MZ1001 # 03 Y:2023 | 03 | 2023 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $904 | $770 | n/a |
MZ1001 # 01 Y:2023 | 01 | 2023 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $12,758 | $83,955 | n/a |
MZ1001 # 02 Y:2023 | 02 | 2023 | INSTALL OCCUPANCY SENSORS | $507 | $1,000 | n/a |
MZ1001 # 04 Y:2023 | 04 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $10,268 | $2,010 | n/a |
MZ0355 # 06 Y:2023 | 06 | 2023 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $29,986 | $2,880 | Not Implemented |
MZ0355 # 05 Y:2023 | 05 | 2023 | RECOVER WASTE HEAT FROM EQUIPMENT | $15,922 | $78,200 | Not Implemented |
MZ0355 # 03 Y:2023 | 03 | 2023 | INSTALL OCCUPANCY SENSORS | $860 | $750 | Not Implemented |
MZ0355 # 04 Y:2023 | 04 | 2023 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $17,125 | $42,980 | Not Implemented |
MZ0355 # 02 Y:2023 | 02 | 2023 | LOWER COMPRESSOR PRESSURE THROUGH A/C SYSTEM MODIFICATION | $9,825 | $7,940 | Not Implemented |
MZ0355 # 01 Y:2023 | 01 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $60,563 | $285,000 | Not Implemented |
MZ0355 # 07 Y:2023 | 07 | 2023 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $1,043 | $320 | Implemented |
MZ0354 # 03 Y:2023 | 03 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,000 | $300 | n/a |
MZ0354 # 01 Y:2023 | 01 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $18,120 | $1,100 | n/a |
MZ0354 # 05 Y:2023 | 05 | 2023 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $43,767 | $294,662 | n/a |
MZ0354 # 02 Y:2023 | 02 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $6,143 | $20,027 | n/a |
MZ0354 # 04 Y:2023 | 04 | 2023 | INSTALL OCCUPANCY SENSORS | $984 | $700 | n/a |